with new AC gearless hoist machines; upgrade the elevator car and hall pushbuttons and signal fixtures to comply with current code requirements including the Americans with Disabilities Act (ADA); remove and replace obsolete landing control equipment; replace lobby panel located in the control center for P1-P4 elevators; when required, upgrade existing building conditions to comply with current elevator safety code and building code requirements;
Jail Elevator Controls Replacement & Upgrade IFB : SJ-18-1501 Summary Local Govt. and Public Bodies Culpeper County Alan Culpeper Construction Invitation for Bids (IFB) Published On : 3/14/18 Amended On : 3/14/18 Closing On : 4/11/18 2:00 PM Intent Posted On: Open Time Left : 27 Days
PRESOLICITATION NOTICE FOR: REPLACE ELEVATOR CONTROLS (BLDG. 330) THIS PROJECT IS SET ASIDE FOR SERVICE-DISABLED VETERAN OWNED SMALL BUSINESSES (SDVOSB) ONLY The Department of Veterans Affairs (VA), Network Contracting Office (NCO) 10 has a requirement to Replace Elevator Controls (Bldg. 330) for project 552-19-107, at the Dayton VA Medical Center, 4100 W. Third Street, Dayton, OH 45428-9000.
A contractor will install new control boards and associated panels in the elevator car and elevator control room. PPE and consumables will be required for this project. All seismic zone requirements, environmental compliance, Life Safety, NFPA, ADA-ABA, and Federal, State and Local Codes and regulations will be considered during all phases of this project.
Contractor shall provide all necessary materials, supplies, tools, equipment, transportation, licenses, permits, prevailing wages, insurance, bonds, and personnel to provide the DSH with 30 Building Elevator Controls (Central) Modernization Services.
Project No. 20C-192-0027 R&R Elevator Controls at BPD Organization:Town of Burlington Department:BTV25 - Buildings & Cemeteries Location:BTV25 - Buildings & Cemeteries Bulletin Desc:All labor & materials associated with the removal and proper disposal of existing elevator controller and the installation of a new elevator controller that contains all duplicate features of the existing elevator at the Burlington Police Station.
Massachusetts Information Technology Center - Elevator Controls Replacement, Chelsea, MA. This project is for the partial and selective modernization of six (6) hydraulic passenger elevators. Installation of new elevator controls and electrical connections for new elevator controls, including testing. This project includes the following Filed Sub-Bids: Elevators; Electrical. The Category of Work is General Building Construction.
The work generally consists of design, equipment supply, installation, commissioning, training and testing for replacement of the control system, DC drive and DC motor for SMUD’s approximately 1,500 ft. incline elevator located at Loon Lake Powerhouse. The control system shall be replaced with a PLC based system and the DC drive/motor shall be replaced with an AC variable frequency drive/motor.
Bulletin Desc: Massachusetts Information Technology Center - Elevator Controls Replacement, Chelsea, MA. This project is for the partial and selective modernization of six (6) hydraulic passenger elevators. Installation of new elevator controls and electrical connections for new elevator controls, including testing. This project includes the following Filed Sub-Bids: Elevators; Electrical. The Category of Work is General Building Construction.