Type Request for Bid Status Issued Number 304520-02 (Ellis Road NW West of Edgewood Road Drainage Improvements) Issue Date & Time 9/13/2022 12:00:01 PM (CT) Close Date & Time 9/28/2022 11:00:00 AM (CT) Time Left18 hours 28 minutes 39 seconds Notes Project Description: The Public Improvement, upon which quotes are requested, generally consists of install two intakes, 50 LF of 15-inch RCP, and full depth pavement repair, located at Ellis Road NW West
Commodity Codes [022-912-19] Clearing and Grubbing Services [022-912-23] Construction, General: Backfill Services, Digging, Ditching, Road Grading, Rock Stabilization, etc. [022-912-44] Excavation Services [022-913-15] Construction, Canal or Aquaduct [022-959-35] Construction Services, General Marine Show More
Supplier Address Anderson's Erosion Control Inc PO Box 205 Junction City, Oregon 97448 ContactKevin MadsenPhone1 (541) 998-2062Fax Emailkevin@andersonsec.om Contract # 730-B37322-20 Opportunity # 730-34173-20 Contract Start Date 02/27/2020 Expiration Date 07/03/2022 Supplier Number 103787 All dates are mm/dd/yyyy
3-C-084-17 - Lone Elm Road, Old 56 Hwy to 151st St. (151st St Roadway Connection) City of Olathe Description:The work consists of the following: This project includes mill and overlay, full depth pavement, curb and gutter, and new street lights along a roadway connection to 151st Street, east of Lone Elm Road. An Owner’s Allowance (Set) determined by the City will be included within the Schedule of Values for this project.
Bid Number: R-3122 Bid Title: East Owens Roadway Extension Category: Engineering Department Bid Opportunities Status: Open Bid Recipient: City Engineer - City of Show Low Description: INVITATION TO BID East Owens Roadway Extension City of Show Low Project No. R-3122 The City of Show Low is extending an invitation for bids for the East Owens Roadway Extension, City of Show Low Project No. R-3122. Work includes, but is not necessarily limited to constructing an 850 foot 2-lane roadway extension with a 3” asphalt over 8” aggregate base section, 1600 LF of new curb, 5000 square feet of new sidewalk, ADA ramps, driveways, and new drainage infrastructure to facilitate the new roadway extension improvement. The work includes all required labor, ma...