Search results for: elwha river bridge bridge

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 49
  • US 101 Elwha River Bridge Bridge Replacement

    Type : Bid Notification

    Due : 21 Dec, 2022 (16 months ago)
    Posted : 17 months ago
    Started : 17 Nov, 2022 (17 months ago)

    US 101 Elwha River Bridge Bridge Replacement Request for Qualified/Certified Participation from Disadvantaged Business Enterprises US 101 Elwha River Bridge Bridge Replacement WSDOT Contract ID #009891 Engineers Estimate $25M DBE Utilization Requirements 17% Bid Date: Revised December 21st, 2022 @ 11:00 am *This is an Electronic Bid Submittal* **Quotes not received by 10:00 AM on bid day may not be reviewed or evaluated** ****Flatiron West Inc IS

    From: Ben Franklin Transit (Transportation)

  • US 101 Elwha River Bridge Bridge Replacement

    Type : Bid Notification

    Due : 21 Dec, 2022 (16 months ago)
    Posted : 18 months ago
    Started : 13 Oct, 2022 (18 months ago)

    Project documents (Plans and Special Provisions) may also be obtained for free on the WSDOT website by using the following link: US 101, Elwha River BridgeBridge Replacement | WSDOT (wa.gov) NOTE: Google Chrome has disabled support for some FTP links and those links won’t work in that browser. You will need to open this page in a different browser to access some of the links.

    From: Washington State Office of Minority and Women (State)

  • RFP: Elwha River Bridge - Bridge Replacement Project

    Type : Bid Notification

    Due : 21 Dec, 2022 (16 months ago)
    Posted : 16 months ago
    Started : 28 Nov, 2022 (17 months ago)

    Johansen Construction Company (JCC) is requesting quotes from Subcontractors & Suppliers for the following project: Project Name: Elwha River BridgeBridge Replacement Owner: Washington State Department of Transportation Bid Closing Date: December 21, 2022, 11:00 AM Subcontractor/Supplier Quote Due Date: November 20, 2022 DBE Condition of Award Goal: 17% Project Duration: 330 Working Days Bids to be submitted to:

    From: Washington State Office of Minority and Women (State)

  • Request For Proposals - Elwha River Bridge - Bridge Replacement

    Type : Bid Notification

    Due : 16 Nov, 2022 (17 months ago)
    Posted : 18 months ago
    Started : 01 Nov, 2022 (18 months ago)

    Johansen Construction Company (JCC) is requesting quotes from Subcontractors and Suppliers for the following project: Project Name: Elwha River BridgeBridge Replacement Owner: Washington State Department of Transportation Bid Closing Date: November 16, 2022, 11:00 AM Subcontractor/Supplier Quote Due Date: November 15, 2022 DBE Condition of Award Goal: 17% Project Duration: 330 Working Days Bids to be submitted to:

    From: Washington State Office of Minority and Women (State)

  • US 101 Elwha River Bridge Replacement

    Type : Bid Notification

    Due : 19 Jan, 2023 (15 months ago)
    Posted : 16 months ago
    Started : 27 Dec, 2022 (16 months ago)

    Project documents (Plans and Special Provisions) may also be obtained for free on the WSDOT website by using the following link: US 101, Elwha River BridgeBridge Replacement | WSDOT (wa.gov) NOTE: Google Chrome has disabled support for some FTP links and those links won’t work in that browser. You will need to open this page in a different browser to access some of the links.

    From: Washington State Office of Minority and Women (State)

  • US 101 Elwha River Bridge Replacement

    Type : Bid Notification

    Due : 19 Jan, 2023 (15 months ago)
    Posted : 16 months ago
    Started : 05 Dec, 2022 (17 months ago)

    US 101 Elwha River Bridge Replacement Request for Qualified/Certified Participation from Disadvantaged Business Enterprises US 101 Elwha River Bridge Bridge Replacement WSDOT Contract ID #009891 Engineers Estimate $25M DBE Utilization Requirements 17% Bid Date: Revised January 19th, 2023 @ 11:00 am *This is an Electronic Bid Submittal* **Quotes not received by 10:00 AM on bid day may not be reviewed or evaluated** ****Flatiron West Inc IS BIDDING

    From: Ben Franklin Transit (Transportation)

  • Ascutney Basin Bridge (Bridge #63) Project

    Type : Bid Notification

    Due : 30 Apr, 2024 (in 1 day)
    Posted : 10 days ago
    Started : 21 Feb, 2024 (2 months ago)

    Install erosion control measures between disturbed areas and the river. No sediment laden stormwater may run from the construction area into the river. Compostable filter socks are to be included within the new swale, of sufficient quantify and spacing, so that no sediment laden stormwater leaves the site. The erosion control measures are to be maintained by the Contractor until permanent vegetation is established.

    From: Weathersfield (Town)