Type : Bid Notification
Attach Emergency Generator Inspection Checklist for each generator. Load bank test report for all four (4) generators. Observations from semi-annual inspections of all automatic transfer switches. Lab results from oil samples taken from each of the 4 generators. Individual quotes for each generator and automatic transfer switch itemizing, in detail, each deficiency and required parts cost and labor cost to complete each repair.