Type : Bid Notification
The Groundwater Sustainability Department is soliciting proposals from qualified firms to provide water resources planning, contracts and policy assessment, engineering, and preliminary design services as required to complete a water supply feasibility and engineering study and Preliminary Engineering Report (PER) to assess the feasibility of delivering water supplies from the State Water Project (SWP) to the Paso Robles Groundwater Basin (Basin)