Search results for: erosion and sediment control

Showing opportunity 1 - 10 of 84
  • Riverbrook Drive Culvert Replacement

    Type : Bid Notification

    Due : 16 May, 2024 (in 17 days)
    Posted : 25 days ago
    Started : 02 Apr, 2024 (26 days ago)

    Work includes replacement of existing pipe arch with 17'-0" x 10'-10" x 58'-6" long aluminum structural plate pipe arch embedded to incorporate a natural stream bottom, reconstruction of stream channel, stream banks, and roadway approaches; installation of one-way temporary bypass road including temporary stream crossing structure, and all associated erosion prevention and sediment control work.

    From: Vermont (State)

  • Long Quarter North Structural Rehabilitation

    Type : Bid Notification

    Due : 14 May, 2024 (in 15 days)
    Posted : 1 month ago
    Started : 14 Mar, 2024 (1 month ago)

    23002 SX0: Long Quarter North Structural Rehabilitation Work includes the rehabilitation of sanitary sewer pipe and sanitary manhole, sanitary bypass pumping during sewer rehabilitation work, traffic controls on State and County roads and pedestrian detour, surface restoration including State and County road pavements, sidewalks, curbs and gutters, and grass seeding, erosion and sediment control for the project site.

    From: Baltimore (County)

  • <b>EROSION</b> & <b>SEDIMENT</b> <b>CONTROL</b> (ERS-20241) - SANTA FE

    EROSION & SEDIMENT CONTROL (ERS-20241) - SANTA FE

    Type : Contract

    Due : 29 Mar, 2024 (1 month ago)
    Posted : 1 month ago
    Started : 20 Mar, 2024 (1 month ago)

    EROSION & SEDIMENT CONTROL (ERS-20241) - SANTA FE Solicitation ID/Procurement Identifier: 140S0124P0002 Ultimate Completion Date: Fri Mar 29 17:00:00 GMT 2024

    From: Federal Procurement Data System (Federal)

  • Hawkins Range Reserve Parking Lot Drainage Improvements

    Type : Bid Notification

    Due : 01 May, 2024 (in 2 days)
    Posted : 17 days ago
    Started : 10 Apr, 2024 (18 days ago)

    S2 Erosion and Traffic Control 1 LS - Lump Sum Provide all labor, materials, equipment, and incidentals needed to provide complete erosion and traffic control per plans, details, and specifications. Erosion and sediment control BMP installation, obtaining required permits, inspection, maintenance and removal per plans and specifications.

    From: Boise (City)

  • RR-23-4899 - Landscape Planting Improvements

    Type : Bid Notification

    Due : 01 May, 2024 (in 2 days)
    Posted : 3 months ago
    Started : 08 Jan, 2024 (3 months ago)

    RR-23-4899 - Landscape Planting Improvements The work under this contract includes planting of trees and shrubs, plant care monitoring of trees and shrubs during the initial planting and extended establishment periods, mowing for planting preparation, maintenance and weed control, applying weed control herbicide, erosion and sediment control, and maintenance of traffic operations.

    From: Illinois tollway (State)

  • Abandoned Mine Reclamation Project, West Liberty South #1, Brady Township, Butler

    Type : Bid Notification

    Due : 09 May, 2024 (in 10 days)
    Posted : 16 days ago
    Started : 28 Mar, 2024 (1 month ago)

    OSM 10(6495)101.1 Abandoned Mine Reclamation Project, West Liberty South #1, Brady Township, Butler County Estimated Amount: $500,000 to $1,000,000 Term: 360 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Implementation of the Erosion and Sediment Pollution Control Plan - Rock Construction Entrance, 2 Each Implementation of the Erosion and Sediment Pollution Control Plan - Compost Filter Sock (32” Diameter), 672

    From: Pennsylvania Department of Environmental Protection (State)

  • Lake Purdy Dam Stability Improvements Project

    Type : Bid Notification

    Due : 02 May, 2024 (in 3 days)
    Posted : 1 month ago
    Started : 15 Feb, 2024 (2 months ago)

    Providing and maintaining erosion and sediment control measures, and obtaining stormwater NPDES Permit. d. Construction of a sedimentation pond and outfall structure. e. Extending and encasing the existing low-level outlet pipes. f. Providing reinforced concrete for pipe encasement, stilling basin, training walls, retaining walls, spillway control section, and raising the dam crest. g.

    From: Birmingham Water Work (City)