Undercut Excavation with offsite disposal (installed) NIGP Code: Quantity: 200.00000 cubic yard Delivery Date: I2_12. Imported Fill clay liner material (installed) NIGP Code: Quantity: 200.00000 cubic yard Delivery Date: Bid Tab Intent Award No Award No public Bid Information to display No public Intent Information to display No public Award Information to display No public No Award Information to display
After installation of the CIPP, in-service laterals connected to rehabilitated lines shall be reinstated and grout sealed as necessary to produce a watertight seal with no annular gaps. ii. The District's Contractor will determine the locations of existing active sewer service lines. The Bidder shall reestablish active sewer service lines without excavation, utilizing a remotely controlled cutting device, monitored by CCTV.
The West Ring Road fill material may be sourced from more proximal clean (non-mineralized) rock material (Siksikpuk shale) excavated from within the Aqqaluk pit. Additional Information: The Aqqaluk Pit was originally authorized in March 2010 under Department of the Army authorization POA-1984-00012-M45 and a time extension was granted November 2014, under POA-1984-00012-M46.
Approximately 885,000 CY of excavation with on-site disposal (including clearing and grubbing, demucking, site preparation, hauling excavation, compaction of material, and clay liner installation).
END OF SECTION TECHNICAL SPECIFICATION WSD BUS GARAGE – UST EQUIPMENT UPGRADE 23 | P a g e TS-4 SITE WORK 4.1 Prior to excavating, the existing asphalt and concrete will be saw cut before excavation can commence. 4.2 Contractor will use professional standards of care during ANY excavation.
Phase 5 will also include re-routing of approximately 415 feet of 8-inch diameter geothermal supply (GS) pipeline.Construction work needed to facilitate the project includes excavation, fill placement, grading, temporary erosion and sedimentation control, permanent seeding, pond liners, elevated bird predation netting system, cast-in-place concrete structures, paving and crushed rock road surfacing, pressurized pipelines for geothermal water distribution