Type : Contract
THREE CANOPIES FOR EXTERIOR DOOR ENTRANCES AT BUILD 14 WEST ELEVATION OF BUILDING. Solicitation ID/Procurement Identifier: HHSF223201610036I Ultimate Completion Date: Tue Oct 19 17:00:00 GMT 2021
THREE CANOPIES FOR EXTERIOR DOOR ENTRANCES AT BUILD 14 WEST ELEVATION OF BUILDING. Solicitation ID/Procurement Identifier: HHSF223201610036I Ultimate Completion Date: Tue Oct 19 17:00:00 GMT 2021
All exterior storm doors and all entrance doors and trim shall also be painted. Garage entry doors and walls in Flat Top units finished garages shall also be painted. Exterior doors (aluminum): White latex paintInterior doors: EggshellWalls: EggshellTrim: EggshellCeiling: Flat ceiling whiteBasement: The basements are to be painted to include all previously painted surfaces in basement.
Here is the list of components: - Sitework - Concrete Foundations and Slabs on Grade - Exterior Masonry Veneer - Misc Metal Fabrications - Interior and Exterior Framing and Rough Carpentry - Siding, Trim, and Window Installation - Interior Casework and Millwork - Spray Foam Insulation - Asphalt and EPDM Roofing - Interior and Exterior Doors, Frames, and Hardware - Aluminum Entrances and Glazing - Drywall and Acoustical Insulation - Acoustical Ceiling
GSA created and added new code FB20 (bio diesel B20 compatible engine) as an option, configure this option accordingly to what you can offer.GSA changed (AED) exterior- door-entrance to air-slide guide or equal, enter the model that you offer in the cell to the right of AED.SIN 377B GSA deleted fuel capacity in US gallons, no action required.GSA changed (AED) exterior- door-entrance to air-slide guide or equal, enter the model that you offer in the
Exterior Entrance Doors & Door Hardware for Monarch Hall IFB : 18-ODU-52-CCC Summary Old Dominion University Neil Cutler Construction Invitation for Bids (IFB) Published On : 5/14/18 Amended On : Closing On : 5/30/18 2:00 PM Intent Posted On: Open Time Left : 13 Days, 5 Hours
The project is to add video intercom and door control to two exterior doors at the north and south entrances to the Administrative Building at the Eldora State Training School. Doors will be able to have audio and video communication to the Reception Desk and the ability to unlock/lock the doors from the touch screen at the Reception Desk.
Scope of work Remove and replace exterior entrance door and sidelight glazing. Remove and replace main entrance revolving door. ... See more