Type : Bid Notification
steps, including concrete footers and other debris, and install new exterior steps at multiple locations on the West Virginia University Institute of Technology campus, located in Beckley, WV.
steps, including concrete footers and other debris, and install new exterior steps at multiple locations on the West Virginia University Institute of Technology campus, located in Beckley, WV.
All exterior storm doors and all entrance doors and trim shall also be painted. Garage entry doors and walls in Flat Top units finished garages shall also be painted. Exterior doors (aluminum): White latex paintInterior doors: EggshellWalls: EggshellTrim: EggshellCeiling: Flat ceiling whiteBasement: The basements are to be painted to include all previously painted surfaces in basement.
In addition, ADA trail improvements such as installation of handrails, geoweb pavement system, #89, #1, #4, and #57stones, limerock, drain system, concrete pads by steps, and sod . Exterior improvements include kayak launch grading, stabilization revetment with limerock, #57 and #89 stones/gravel, mobi-mat installation, and site stabilization with type 1, 2, and site rock revetment.
Each individual station/room shall have a separate entrance door with Exterior steps and handrails. 3. Vacancy identifying locks indicating when the stall is in use. 4. Durable external locking capability when the trailer is not in use. 5. Construction of the trailer to be able to hold up for all 4 seasons. 6. Internal heating and cooling system for the individual stalls and any utility areas. 7. Seamless laminated flooring. 8.
Steps needs handrails.Rear wooden steps connected to back door of CabinPaint Exterior of Home to Match Other 3 Bedroom Cabins On-site (Sherwin Williams: Aurora Brown)Smoke Detectors - 4 EA (1 EA in Living Room and 1 EA in all of the bedrooms) No Exterior HornsMetal Roof - Green to match the other 3 Bedroom Cabins On-siteKitchen Appliances to include: Microwave, Oven, and Refrigerator No dishes or utensilsLiving Room Furniture & Bedroom Furniture:
Contractor is responsible for coordinating with COR to ensure steps are taken to protect interior and exterior of building from any contamination or damage related to this project.
Contractor is responsible for coordinating with COR to ensure steps are taken to protect interior and exterior of building from any contamination or damage related to this project.