Type : Bid Notification
Perform an External AST inspection to also include the visual inspection of the containment area. The contractor shall visually inspect containment for ability to contain the entire contents of the tank in the event of catastrophic failure, assessing for cracks, settlement, and deterioration. Record dimensions of cracks and provide photographic evidence of each deficiency.5.1.2.