Search results for: fabrication ii request

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 14
  • General and Precision Machining/Fabrication II Request for Information (RFI)

    Type : Bid Notification

    Due : 26 Aug, 2021 (about 2 years ago)
    Posted : about 2 years ago
    Started : 26 Jul, 2021 (about 2 years ago)

    Please see attachment for additional information.

    From: Federal Government (Federal)

  • Request for Information LCLS-II HE Magnetic System Fabrication and Assembly

    Type : Bid Notification

    Due : 12 Jan, 2021 (about 3 years ago)
    Posted : about 3 years ago
    Started : 06 Jan, 2021 (about 3 years ago)

    NOTE - Revised due date January 12, 2021Reference the attached Request for Information (RFI) RFI-JS-FY21-002 for details related to this request.  Responses shall be provided in accordance with the directions provided therein.The scope of work includes the production of magnetic systems for the LCLS-II HE undulator upgrade.

    From: Federal Government (Federal)

  • FABRIC

    Type : Contract

    Due : 11 Mar, 2026 (in 22 months)
    Posted : about 3 years ago
    Started : 31 Mar, 2021 (about 3 years ago)

    FABRIC Solicitation ID/Procurement Identifier: 15UC0C21D00000994 Ultimate Completion Date: Wed Mar 11 17:00:00 GMT 2026

    From: Federal Procurement Data System (Federal)

  • Fabric Structures with Related Materials and Services

    Type : Bid Notification

    Due : 12 Jul, 2023 (9 months ago)
    Posted : 11 months ago
    Started : 18 May, 2023 (11 months ago)

    Fabric Structures with Related Materials and Services Project Description :Sourcewell, a State of Minnesota local government unit and service cooperative, is requesting proposals for Fabric Structures with Related Materials and Services to result in a contracting solution for use by its Participating Entities... See more

    From: MerX (Federal)

  • Fabric Structures with Related Materials and Services

    Type : Bid Notification

    Due : 12 Jul, 2023 (9 months ago)
    Posted : 11 months ago
    Started : 14 May, 2023 (11 months ago)

    A full copy of the Request for Proposals can be found on the Sourcewell Procurement Portal [https://proportal.sourcewell-mn.gov]. Only proposals submitted through the Sourcewell Procurement Portal will be considered. Proposals are due no later than July 12, 2023, at 4:30 p.m. Central Time, and late proposals will not be considered.

    From: Sourcewell (Other)

  • Fabrication Supplies

    Type : Bid Notification

    Due : 19 Oct, 2023 (6 months ago)
    Posted : 6 months ago
    Started : 17 Oct, 2023 (6 months ago)

    Info Items Issued By: Science Museum of Virginia Opportunity Type: Quick Quote Category: Supplies - Non-Technology Work Location: Science Museum of Virginia for the Green Space Phase II Website: Summary: See attached spreadsheet with website links to items from suggested suppliers. Some items need to be the exact brand specified, as indicated in the Substitute OK column.

    From: Virginia (State)

  • Pre-Fabricated Modular Facility

    Type : Bid Notification

    Due : 28 Jun, 2023 (10 months ago)
    Posted : 10 months ago
    Started : 21 Jun, 2023 (10 months ago)

    Luke AFB is looking to purchase Two (2) 40' x 32' (1280 sq ft) open span buildings connected tocreate a single 2560 sq ft open span building (with onesupport post between the two connected buildings). Modular structure needs to be fullyinsulated with re-finished walls. Wired for electric withindustrial lighting installed. Two layers of 3/4 plywoodflooring. Minimum of two doorways on each building, one (1)standard personnel door on one end of the structure and one(1) 72” wide double door on the opposite end.

    From: Federal Government (Federal)