Search results for: fan coil and chilled

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 300
  • Fan Coil Units Replacement

    Type : Bid Notification

    Due : 10 May, 2024 (in 12 days)
    Posted : 17 days ago
    Started : 11 Apr, 2024 (17 days ago)

    Fan Coil Units: • Fan Coil Units: Enviro-Tec Model HLF-D12 (See Attachment A) • Room Controller: SE8300 (See Attachment B) • 4-row chilled water coil with 2-row heating coil preferred; 1-row heating acceptable. Please provide spec sheet and performance data with bid. • Stainless steel casings on coils.

    From: University of Oklahoma (Higher Education)

  • Chilled Water Lines and Fan Coil Units Replacement

    Type : Bid Notification

    Due : 03 Apr, 2024 (24 days ago)
    Posted : 2 months ago
    Started : 19 Mar, 2024 (1 month ago)

    FOR: Chilled Water Lines and Fan Coil Units Replacement Buildings 7 and 8 Department of Corrections Headquarters Baton Rouge, Louisiana PROJECT NUMBER: 01-107-18-02, F.01004432 & 01-107-98-04, F.01004507 (Supplement) Complete Bidding Documents for this project are available in electronic form. They may be obtained without charge and without deposit from Eyre Engineering, LLC.

    From: Louisiana Division of Administration (State)

  • GAB - Install Chilled Water Fan Coil to Control Room

    Type : Bid Notification

    Due : 08 Dec, 2022 (16 months ago)
    Posted : 17 months ago
    Started : 02 Dec, 2022 (17 months ago)

    Project: GAB - Install Chilled Water Fan Coil to Control Room Ref. #: Q2022.207 Type: ITQ Status: Open Open Date: Dec 2nd 2022, 8:00 AM EST Questions Due Date: Dec 7th 2022, 4:30 PM EST Close Date: Dec 8th 2022, 4:30 PM EST Days Left: < 1 Project Description:The Facilities Management Department The Facilities Management Department is seeking the installation of: One CLM Model TCH024AG, with Horizontal Configuration, Voltage 208-230/60/1 – PSC Motor

    From: Cayman Islands Government (State)

  • Q&A #1-4. Construction. B102 HVAC Renovation and Chiller Upgrade. Provide chiller, chilled water piping, expansion, glycol system, cassette fan

    Type : Bid Notification

    Due : 24 May, 2022 (23 months ago)
    Posted : 23 months ago
    Started : 23 May, 2022 (23 months ago)

    Contractor shall provide chiller, chilled water piping, expansion, glycol system, cassette fan coil units, controls, electric duct heaters, and electrical connections. 

    From: Federal Government (Federal)

  • Amendment 0001. Q&A #1-4. Construction. B102 HVAC Renovation and Chiller Upgrade. Provide chiller, chilled water piping, expansion, glycol system, casset...

    Type : Bid Notification

    Due : 24 May, 2022 (23 months ago)
    Posted : 23 months ago
    Started : 24 May, 2022 (23 months ago)

    Contractor shall provide chiller, chilled water piping, expansion, glycol system, cassette fan coil units, controls, electric duct heaters, and electrical connections. 

    From: Federal Government (Federal)

  • Construction. B102 HVAC Renovation and Chiller Upgrade. Site Visit 0930 Wednesday 27 Apr 2022. Provide chiller, chilled water piping, expansion, glycol s...

    Type : Bid Notification

    Due : 24 May, 2022 (23 months ago)
    Posted : about 2 years ago
    Started : 22 Apr, 2022 (about 2 years ago)

    Contractor shall provide chiller, chilled water piping, expansion, glycol system, cassette fan coil units, controls, electric duct heaters, and electrical connections. 

    From: Federal Government (Federal)

  • 2830-- Service to remove and replace chilled water fan coil and chilled water control valve - Bldg. 1 Basement

    Type : Bid Notification

    Due : 21 Jun, 2021 (about 2 years ago)
    Posted : about 2 years ago
    Started : 15 Jun, 2021 (about 2 years ago)

    Contractor shall provide labor and material to isolate chilled water lines to the air handler and drain coil. Contractor shall provide labor and material to disconnect all services to the air handler, rig it down, and dispose of it off site. Contractor shall provide labor and material to rig in new chilled water fan coil and secure the fan coil.

    From: Federal Government (Federal)