Search results for: feeder and substation

Showing opportunity 1 - 3 of 3
  • 24-23812 Lucas Substation Upgrade and Phase 1 Feeder Reconfiguration

    Type : Bid Notification

    Due : 30 Apr, 2024 (in 12 days)
    Posted : 21 days ago
    Started : 12 Mar, 2024 (1 month ago)

    24-23812 Lucas Substation Upgrade and Phase 1 Feeder Reconfiguration Response Due by Apr 30, 2024 4:00 PM (AKST) MEA is requesting bids for the project called Lucas Substation Upgrades and Phase 1 Feeder Reconfiguration.

    From: Matanuska Electric Association (Co-op)

  • 15kV Metalclad Switchgear for Vista Bay 2.

    Type : Bid Notification

    Due : N/A
    Posted : 1 month ago
    Started : 15 Feb, 2024 (2 months ago)

    Benton PUD - 7 - Specification 2024-01 Revised 2/8/2024 4.1.g Floor cutouts for the four feeder getaway conduits shall be provided. The feeder cutouts shall be approx. 16" X 30". A steel skirt will be required around the base to prevent rodents and snakes from getting into the switchgear and the feeder conduits.

    From: Benton Public Utility District (Utilities)