Search results for: feet length

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 5,246
  • ITEM# 33085T79 - STRUT CHANNEL, SLOTTED HOLE, 316 STAINLESS STEEL, 2 FEET LENGTH

    Type : Contract

    Due : 13 Jan, 2023 (15 months ago)
    Posted : 20 months ago
    Started : 19 Aug, 2022 (20 months ago)

    ITEM# 33085T79 - STRUT CHANNEL, SLOTTED HOLE, 316 STAINLESS STEEL, 2 FEET LENGTH Solicitation ID/Procurement Identifier: 12FPC322Q0081 Ultimate Completion Date: Fri Jan 13 18:00:00 GMT 2023

    From: Federal Procurement Data System (Federal)

  • Umpqua National Forest Road Failure Construction Repairs

    Type : Bid Notification

    Due : 15 May, 2024 (in 20 days)
    Posted : 11 days ago
    Started : 23 Apr, 2024 (Yesterday)

    Three site locations:1) National Forest System Road 2700 MP 3.42: Design and Construction of a Mechanically Stabilized Earth retaining wall, of approximate dimensions, 20' height and 154' length.2) National Forest System Road 3114 MP 1.97: Realign 360 feet length of road, shifting into the hillside.3) National Forest System Road 3114 MP 2.24: Construction of a reinforced soil slope with approximate dimensions of 50' height and total length of 174

    From: Federal Government (Federal)

  • FLEXIBELTBOOM (10 FEET LENGTH)- ELASTEC AMERICAN MARINE / EQUIVALENT

    Type : Bid Notification

    Due : 16 Jan, 2024 (3 months ago)
    Posted : 3 months ago
    Started : 16 Jan, 2024 (3 months ago)

    1) FLEXIBELTBOOM (10 FEET LENGTH)- ELASTEC AMERICAN MARINE / EQUIVALENT | Qty: 2 PC. Contact Information Saleh Al Fori M +968 93216972 | T 24 520322 Email:Saleh.ALFori@asyad.om

    From: ASYAD’s Drydock (Co-op)

  • Sir Francis Drake Blvd MP 20.97 Slide Repair Project

    Type : Bid Notification

    Due : 02 May, 2024 (in 8 days)
    Posted : 14 days ago
    Started : 09 Apr, 2024 (15 days ago)

    One wall will be approximately 101 feet in length and the other will be approximately 148 feet in length. Work will also involve a culvert replacement, installation of rock slope protection, and roadway paving. Construction for this project shall ONLY occur between June 15 and October 15 unless granted approval from the County. Nesting bird survey is required if work is to occur between February 15 to August 31.

    From: Marin County (County)

  • BAR, METAL

    Type : Bid Notification

    Due : 03 May, 2024 (in 9 days)
    Posted : 1 day ago
    Started : 23 Apr, 2024 (Yesterday)

    MATERIAL SHALL BE SUPPLIED WITHIN THE REQUIRED MIN-MAX LENGTH REQUIREMENTS AND MUST IN WHOLE FEET LENGTH ONLY (I.E. 10, 11, OR 12 FT EVEN) CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: CONTINUED ON NEXT PAGE PAGE 7 OF 24 PAGES SPE8E4-24-T-1708 SECTION B PERMISSIBLE MARKING METHODS ARE STAMPING (EXCEPT DIE STAMP) OR STENCILING. THE CHARACTERS SHALL BE OF SUCH A SIZE AS TO BE LEGIBLE AND VISIBLE TO THE UNAIDED EYE.

    From: Federal Government (Federal)

  • ENG 2019-22 SFDB MP 20.97 SLIDE REPAIR PROJECT

    Type : Bid Notification

    Due : 02 May, 2024 (in 8 days)
    Posted : 13 days ago
    Started : 26 Mar, 2024 (28 days ago)

    One wall will be approximately 101 feet in length and the other will be approximately 148 feet in length. Work will also involve a culvert replacement, installation of rock slope protection, and roadway paving. Construction for this project shall ONLY occur between June 15 and October 15 unless granted approval from the County. Nesting bird survey is required if work is to occur between February 15 to August 31.

    From: Marin (County)

  • Folding Partition Wall - Walter Fuller Recreation Center

    Type : Bid Notification

    Due : 01 May, 2024 (in 7 days)
    Posted : 12 hours ago
    Started : 23 Apr, 2024 (Yesterday)

    The dimensions of the wall are 25 feet 7 inches in length and 9 feet (108 inches) in height. The replacement wall must be padded, slide on tracks attached to the ceiling and floor, and have a door.TimelineRelease Project Date:April 23, 2024Question Submission Deadline:April 26, 2024, 3:00pmProposal Submission Deadline:May 1, 2024, 3:00pm

    From: St Petersburg (City)