Type : Bid Notification
Marine Terminal Fender Pile Replacement 2019 Agency: Port of Everett Category: Construction Location: Everett , Washington Due Date: August 08, 2019 2:00 PM (PDT)
Marine Terminal Fender Pile Replacement 2019 Agency: Port of Everett Category: Construction Location: Everett , Washington Due Date: August 08, 2019 2:00 PM (PDT)
Port of Bellingham - Harris Shipyard Outer Pier (MCI Pier) Fender Pile Replacement Notice is hereby given that sealed bids for the Harris Shipyard Outer Pier (MCI Pier) Fender Pile Replacement located in Bellingham, Washington will be received at the Administrative Offices of the Port of Bellingham, 1801 Roeder Avenue, Bellingham, Washington until 2:00 p.m., Thursday, July 13, 2023.
Terms:#1Dec 2, 2022 Feb 15, 2023#2Dec 12, 2022 Mar 16, 2023Project:Port of EverettStatus:ActiveVendor:American Construction Co., IncExtendable:No Description: Value:$236,041.02Contract Number:MT-GN-2022-04Competitive Process:Informal SolicitationFunding Source:Port FilesShow/Hide Download grid export Drag here to set row groupsDrag here to set column labels Name Type Date Created Action No Rows To Show Columns Name to of Page of
Solicitation #: B210184BJB Project Name: Midpoint Fender System Pile Clusters Cable Replacement Scope of Work: Lee County Board of County Commissioners seeks to contract with a qualified Contractor to perform the removal and replacement of pile cluster cables on the bridge fender system of the Midpoint Bridge.
testing; upgrades to existing recessed bollard installations; steel pipe pile installation; fender replacement and repairs; ladder replacement and repairs; riprap shoreline stabilization repairs; and all related work at all marine terminals and Administration facilities.
The work includes structural and fender pile replacement, cap, stringer and decking repair and complete replacement of a remote dolphin structure.
after the float is reconfigured.Waste haul piling removed from Gate 1 under Schedule A.SCHEDULE BThis schedule of work will replace a structural pile at the Firebelle Pier Gill Net Loading Zone (GNLZ) Wharf, including but not limited to:Replace one creosote-treated timber structural pile with a new ACZA-treated timber pier pile at the Firebelle Pier (fender pile replacement excluded from this Contract).Repair any deck damage resulting from the pile