Refine your Search
Apply several filters to get precise search results
Filters Applied Clear
Bid NotificationPre-Bid NotificationAwardContractActiveArchived
Search results for: fender replacement and structural
Showing opportunity 1 - 10 of 28
  • POS BERTHS 7 & 8 FENDER REPLACEMENT AND STRUCTURAL IMPROVEMENTS

    Type : Bid Notification
    Due : 25 May, 2022 (4 months ago)
    Posted : 5 months ago
    Started : 14 Apr, 2022 (5 months ago)

    See more details...

    From: Diede Construction, Inc. (Co-op)
  • Maintenance Bridge Fender Replacement Contract 2017-2, Aberdeen and Old Bridge Townships, Atlantic City and Sayreville Borough

    Type : Bid Notification
    Due : 24 May, 2018 (about 4 years ago)
    Posted : about 4 years ago
    Started : 03 May, 2018 (about 4 years ago)

    Contractors Prequalified in one of these Work Types are eligible to bid this project: 4, 4a, 4b or 5 The principal items of work consist of: Bridge: Quantity Unit Description 2,794 LF POLYMER STRUCTURAL PILE, DOLPHIN 8,111 LF POLYMER STRUCTURAL WALE 2,162 LF POLYMER STRUCTURAL WALE COMPOSITE LUMBER POST 635 LF POLYMER STRUCTURAL MAINTENANCE WALKWAY 4,800 LF POLYMER STRUCTURAL PILE TYPE 1 2,246 LF RUBBER PIER FENDER DD 300 SERIES 3,259 LF RUBBER PIER

    From: New Jersey Department of Transportation (Transportation)
  • Oil Dock 4 Ship Fender System Repairs

    Type : Bid Notification
    Due : 06 Oct, 2017 (about 5 years ago)
    Posted : about 5 years ago
    Started : 22 Sep, 2017 (about 5 years ago)

    Tel 361-885-6131 Fax 361-881-5163 jacob@pocca.com Secondary Project Manager Engineering Admin Group Tel 361.882.5633 Fax 361.881.5161 engadmin@pocca.com Description Scope of work generally includes replacement of fender rubber elements and fender panels for two ship breasting structures at public Oil Dock 4 including the fabrication of structural steel adapter plates to accommodate

    From: Corpus Christi (City)
  • NASA SSC Miter Gate Rehab

    Type : Award
    Due : 29 Sep, 2021 (12 months ago)
    Posted : 12 months ago
    Started : 25 Sep, 2021 (12 months ago)

    The miter gate rehabilitation consists of blasting and painting the gates,  replacement of all timber fenders, replacement of miter gate rubber seals, and structural member replacement and repair.  Rehabilitation also  includes cathodic protection system removal, repair, installation, and testing by corrosion expert in accordance with specifications.

    From: Federal Government (Federal)
  • Y--WHARF BRAVO STRUCTURAL REPAIRS, NSGUANTANAMO BAY, CUBA.

    Type : Award
    Due : N/A
    Posted : about 5 years ago
    Started : 23 Nov, 2016 (about 5 years ago)

    This project will repair Wharf Bravo including repair of steel sheet pile, repair sections of spalled concrete, replacement of steel fender framing, replacement of missing chains on the pneumatic camels and cleaning and recoating and/or replacing deteriorated mooring fittings. The project includes installation of new steel sheet pile wall in order to create a single linear facility.

    From: Federal Government (Federal)
  • AUKE BAY FERRY TERMINAL MODIFICATIONS & IMPROVEMENTS

    Type : Bid Notification
    Due : 28 May, 2020 (about 2 years ago)
    Posted : about 2 years ago
    Started : 29 Apr, 2020 (about 2 years ago)

    This project consists of offshore structural improvements and modifications to the existing stern berth facility in Auke Bay to accommodate the AMHS ACF ferry vessel and includes replacement of two stern fenders, removal of one existing 5-pile dolphin, and installing 3 new 5-pile floating fender dolphins. Work includes structural steel fabrication and installation, pile driving, and pile tension anchors.

    From: Alaska ()
  • Port of Port Angeles Terminal 1 Redevelopment Project

    Type : Bid Notification
    Due : 15 Jul, 2015 (about 7 years ago)
    Posted : about 2 years ago
    Started : 15 Jun, 2015 (about 7 years ago)

    The work includes structural and fender pile replacement, cap, stringer and decking repair and complete replacement of a remote dolphin structure.

    From: Port Angeles (Port)
  • NASA Stennis Space Center Miter Gate Rehabilitation Construction Contract

    Type : Pre-Bid Notification
    Due : 13 Jul, 2021 (14 months ago)
    Posted : 17 months ago
    Started : 06 Jul, 2021 (15 months ago)

    The miter gate rehabilitation consists of blasting and painting the gates, replacement of all timber fenders, replacement of miter gate rubber seals, and structural member replacement and repair. Rehabilitation also includes cathodic protection system removal, repair, installation, and testing by corrosion expert in accordance with specifications.

    From: Federal Government (Federal)
  • Gate 1 and Squalicum Harbor Maintenance

    Type : Bid Notification
    Due : 22 Oct, 2021 (11 months ago)
    Posted : 11 months ago
    Started : 07 Oct, 2021 (11 months ago)

    after the float is reconfigured.Waste haul piling removed from Gate 1 under Schedule A.SCHEDULE BThis schedule of work will replace a structural pile at the Firebelle Pier Gill Net Loading Zone (GNLZ) Wharf, including but not limited to:Replace one creosote-treated timber structural pile with a new ACZA-treated timber pier pile at the Firebelle Pier (fender pile replacement excluded from this Contract).Repair any deck damage resulting from the pile

    From: Port of Bellingham (Port)
Refine your Search
Apply several filters to get precise search results
Filters Applied Clear
Bid NotificationPre-Bid NotificationAwardContractActiveArchived