Type : Bid Notification
Other Details Because of the dissimilarities between the existing fiberoptic cable plants and Intermediate Data Frames at each school, a non-mandatory job walk will be conducted at each school site in order to determine the type and quantity of fiberoptic cabling needed, as well as the capacity of each IDF cabinet that requires replacement. Please refer to pages 5-6 of the Specifications for job walk information and schedule.