Search results for: filters and drift

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 159
  • Donaldson Inlet Filters and Drift Eliminators

    Type : Bid Notification

    Due : 05 Dec, 2022 (16 months ago)
    Posted : 17 months ago
    Started : 18 Nov, 2022 (17 months ago)

    Bid #RFB 22-23-46 - Donaldson Inlet Filters and Drift Eliminators RFB Bid contact:Please log in to view Bid contact informationIssuing agency:City of Santa Clara, CASee other Bids by this agencyBid Comments: The City of Santa Clara (hereinafter “City”) is soliciting bids from qualified vendors to provide inlet filters with prefilters, and both upstream and downstream drift eliminators for two (2) Donaldson inlet units for GE LM6000 Turbines, in support

    From: San Jose (City)

  • Donaldson Inlet Filters and Drift Eliminators

    Type : Bid Notification

    Due : 05 Dec, 2022 (16 months ago)
    Posted : 17 months ago
    Started : 18 Nov, 2022 (17 months ago)

    The City of Santa Clara (hereinafter “City”) is soliciting bids from qualified vendors to provide inlet filters with prefilters, and both upstream and downstream drift eliminators for two (2) Donaldson inlet units for GE LM6000 Turbines, in support of Silicon Valley Power, the City's Utility. This solicitation was previously issued under RFQ# 21-22-19.

    From: Santa Clara (City)

  • Purdom Unit 8 Filter House Inlet Repair

    Type : Bid Notification

    Due : 07 May, 2024 (in 9 days)
    Posted : 18 days ago
    Started : 08 Apr, 2024 (19 days ago)

    is for the removal, blasting (via either high pressure water or dry ice) to remove rust, chipping paint and silicone caulking, recoating of and installation of all media which includes: weatherhood moisture separators, inlet filters, evaporative cooler media, and drift eliminators for the City of Tallahassee's Purdom Generating Station - Unit 8, a GE Frame 7FA gas turbine inlet filter house manufactured by Donaldson Company, Inc.

    From: Tallahassee (City)

  • BUILDING MANAGEMENT SYSTEMS MAINTENANCE (221335-002)

    Type : Bid Notification

    Due : 31 Dec, 2024 (in 8 months)
    Posted : 8 days ago
    Started : 04 Apr, 2024 (23 days ago)

    All manual initiated devices shall be activated and alarm verified at the main panel. All automatic sensing devices shall be cleaned and initiated and their alarm signal verified at the main panel. All audible and visual alarm devices shall have their operation verified.

    From: Erie (County)

  • Acquisition of a Preventive Maintenance Agreement for JPK NanoWizard®

    Type : Pre-Bid Notification

    Due : 27 Dec, 2022 (16 months ago)
    Posted : 16 months ago
    Started : 15 Dec, 2022 (16 months ago)

    for elimination of cross talk with fluorescence illumination • In-situ switch from air to liquid operation • Physical access to cantilever region from all sides (e.g. micro pipettes) • Stand for AFM head included • Includes SP-90-08 JPK Cantilever Holder fixed spring• Cantilever holder is easy to clean with detergents, certain solvents and ultrasonic bath Light Source• 980nm light source for better separation from VIS range • Recommended in combination

    From: Federal Government (Federal)

  • Alpha Spectroscopy System

    Type : Bid Notification

    Due : 24 Jul, 2019 (about 4 years ago)
    Posted : about 4 years ago
    Started : 17 Jul, 2019 (about 4 years ago)

    ACCESSORIES:■ POWER: 120v +/- -10%■ A450-18AM Alpha PIPS Detectors (24 ea)■ Direct drive vacuum pump, 120V ■  FILTER, ONE PORT WITH CARTRIDGE, VACUUM LINE OIL VAPOR FILTER■ Replacement filter cartridges (pack of 5)■ Exhaust filter kit to reduce noise and oil vapor■ Replacement exhaust filter■APEX Alpha Server license■ APEX Client license S772C-requires current versions of S500C,S509C, S505C, S506C requires -Requires Windows 7 x32 and x64, or W10 x

    From: Federal Government (Federal)

  • Continuous Emissions Monitoring System

    Type : Bid Notification

    Due : 03 Jan, 2019 (about 5 years ago)
    Posted : about 5 years ago
    Started : 19 Dec, 2018 (about 5 years ago)

    Documentation shall include a description of all recommended maintenance procedures and spare parts.xi) System PLC controller and CEMS shall be mounted in a self-standing 19" open rack enclosure (for cooling).xii) Sample panel and conditioning plate will be panel mounted (not inside enclosure) for ease of access.c) INPUT/OUTPUTSi) The CEMS system shall provide process signals for each measured parameter and each of the calculated values listed below

    From: Federal Government (Federal)