Search results for: filtrate pumps

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 60
  • RFQ#RFQ 24-009 - FILTRATE PUMPS

    Type : Bid Notification

    Due : 09 May, 2024 (in 4 days)
    Posted : 4 days ago
    Started : 01 Apr, 2024 (1 month ago)

    The City of Kennewick is requesting quotations for four (4) Goulds Pumps model 3180 Filtrate Pump as reflectedin the quotation form below and the accompanying technical specifications and drawings included as ATTACHMENT 1 SPECIFICATIONS. Quotation of alternative or substitute items other than item reflected in the specifications will result in a quotation being considered nonresponsive. No substituteswill be accepted.

    From: City of Kennewick (City)

  • RFQ #RFQ 24-009 -FILTRATE PUMPS

    Type : Bid Notification

    Due : 09 May, 2024 (in 4 days)
    Posted : 15 days ago
    Started : 16 Apr, 2024 (18 days ago)

    The City of Kennewick is requesting quotations for four (4) Goulds Pumps model 3180 Filtrate Pump as reflected in the quotation form below and the accompanying technical specifications and drawings included as ATTACHMENT 1SPECIFICATIONS. Quotation of alternative or substitute items other than item reflected in the specifications will result in a quotation being considered nonresponsive. No substitutes will be accepted.

    From: City of Kennewick (City)

  • City of Palm Springs WWTP Digester No. 2 Gas Waste Flare and Filtrate Pump Station Improvements Project

    Type : Bid Notification

    Due : 31 Mar, 2022 (about 2 years ago)
    Posted : about 2 years ago
    Started : 27 Jan, 2022 (about 2 years ago)

    Pump Station and Filtrate Pump Station forcemain.

    From: City of Palm Springs (City)

  • Shook Construction/Neuse Side Stream

    Type : Bid Notification

    Due : 14 Jul, 2022 (22 months ago)
    Posted : 22 months ago
    Started : 29 Jun, 2022 (22 months ago)

    The Sidestream Treatment – Bid Package No. 12 entails the construction of the new Sidestream Treatment Process Tank, IFAS Clarifier, Service Building, and new Filtrate Pump Station to be constructed as part of the Project. The Owner is exempt from Sales and Use Taxes on materials and equipment to be incorporated in the Work – Sales Tax is NOT to be included in the Bid for items permanently incorporated into the Work.

    From: The Institute Economic Development (State)

  • Neuse River Recovery Sidestream Treatment

    Type : Bid Notification

    Due : 21 Jun, 2022 (22 months ago)
    Posted : about 2 years ago
    Started : 29 Apr, 2022 (about 2 years ago)

    The Sidestream Treatment ‐ Bid Package No. 12 entails the construction of the new Sidestream Treatment Process Tank, IFAS Clarifier, Service Building, and new Filtrate Pump Station to be constructed as part of the Project.

    From: Raleigh (City)

  • NEUSE RIVER RESOURCE RECOVERY FACILITY (NRRRF)

    Type : Bid Notification

    Due : 14 Jul, 2022 (22 months ago)
    Posted : 22 months ago
    Started : 27 Jun, 2022 (22 months ago)

    The Sidestream Treatment ‐ Bid Package No. 12 entails the construction of the new Sidestream Treatment Process Tank, IFAS Clarifier, Service Building, and new Filtrate Pump Station to be constructed as part of the Project.

    From: Raleigh (City)

  • PLANT CAPACITY EXPANSION

    Type : Bid Notification

    Due : 31 Mar, 2021 (about 3 years ago)
    Posted : about 3 years ago
    Started : 21 Feb, 2021 (about 3 years ago)

    with aerobic and anoxic zones, bioreactors process trains, submerged membrane basins with membrane cassettes and filtrate pumps, blower building with aeration and air scour blowers and electrical building, chemical feed and storage facility, standby power facility with engine generator, above ground fuel storage and switchgear, solids handling facility with screw presses and new screw conveyor system, along with miscellaneous functional structures

    From: Gilroy (City)