Type : Bid Notification
In addition to floodplain restoration and berm removal, the final design and engineering work will incorporate a vision for the site identified during community engagement meetings.
In addition to floodplain restoration and berm removal, the final design and engineering work will incorporate a vision for the site identified during community engagement meetings.
Bid Title:RFP for Final Design Engineering CSAH 5 from TH 36 To Autumn Way Category:Washington County Public WorksStatus:Open Description: The purpose of the Request for Proposal is to provide final design engineering for proposed improvements to CSAH 5 between TH 36 and ~200’ North of Autumn Way.
Public Works PW-S35121-06C Final Design Engineering Services for the Long Beach WPCP Decommissioning and Demolition Project Open 05/12/2023 09:00 AM EDT 06/16/2023 03:00 PM EDT
Description: Click here to download RFP #20-15 Publication Date/Time: 8/12/2020 8:30 AM Publication Information: Journal & Topics News Closing Date/Time: 9/2/2020 12:00 PM
Description: The Washington County Public Works Department is issuing this Request for Proposal (RFP) to provide preliminary and final design engineering for proposed improvements to CSAH 25 (Century Ave. S.) between Brookview Dr. and S. Century Ave.
The final design work will quantify nutrient and sediment reduction for floodplain restoration scenarios at this site. This project involves removing a gravel parking lot and revegetating the area with thick, woody vegetation. The parking lot will be relocated to a safer location south of the recreation fields on the Town owned parcel. The addition of a vegetated “flood bench” will act as a floodplain and convey floodwaters in large storms.
The final design work will quantify nutrient and sediment reduction for floodplain restoration scenarios at this site. This project involves removing a gravel parking lot and revegetating the area with thick, woody vegetation. The parking lot will be relocated to a safer location south of the recreation fields on the Town owned parcel. The addition of a vegetated “flood bench” will act as a floodplain and convey floodwaters in large storms.