Search results for: fired tube

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 56
  • For Sale - Volcano Oil Fired Tube Steam Boiler

    Type : Bid Notification

    Due : 08 Jul, 2021 (about 2 years ago)
    Posted : about 2 years ago
    Started : 10 Jun, 2021 (about 2 years ago)

    Central Regional Health Authority (Central Health) is administering this Invitation to Tender on behalf of Eastern Regional Health Authority for prospective bidders submit bids on the sale of a Volcano oil fired tube steam boiler.  This will be in accordance with the specifications and requirements set out in Schedule “A”, as well as the Public... See more

    From: MerX (Federal)

  • California Conservation Corps,Fortuna Center Kitchen Remodel

    Type : Bid Notification

    Due : 13 May, 2022 (about 2 years ago)
    Posted : about 2 years ago
    Started : 27 Apr, 2022 (about 2 years ago)

    Add an Imperial IFST-25 tube fired countertop deep fryer placed on top of refrigerator. The Work ¿ Food Service Line 1. Install Advance Tabco DSG-15S Sleek Shield Multi-Use Shield with Stainless Steel Shelf. Width as determined by onsite conditions. Please check the IFB Package for more details.

    From: California (State)

  • Bus Wash HVAC IFB

    Type : Bid Notification

    Due : 12 Oct, 2023 (6 months ago)
    Posted : 8 months ago
    Started : 14 Aug, 2023 (8 months ago)

    The Authority will receive Bids related to costs necessary for the removal of natural-gas fired infrared tube heaters and replacement with a combined hot air, boiler heating system. The organization serves and maintains locations in Adams, Columbia, Cumberland, Dauphin, Franklin, Harrisburg City, Montour, Northumberland, Perry, Snyder, Union and York Counties. This solicitation covers only the York County Location.

    From: Rabbit Transit (Transportation)

  • Paving Building Fire Suppression System

    Type : Bid Notification

    Due : 31 Jan, 2019 (about 5 years ago)
    Posted : about 5 years ago
    Started : 08 Feb, 2019 (about 5 years ago)

    Where the building is protected with a fire alarm system, this interlock shall be in accordance with the requirements of NFPA 72.Three gas-fired infrared tube heaters will need to be incorporated with the design of the sprinkler system and in accordance with NFPA 54. Manufacturer, Dayton; Model 7D849 150,000 BTUHQuotes are due by January 31, 2019 at 9am Mountain Time.

    From: Federal Government (Federal)

  • Bus Wash HVAC IFB

    Type : Bid Notification

    Due : N/A
    Posted : 8 months ago
    Started : 13 Aug, 2023 (8 months ago)

    The Authority will receive Bids related to costs necessary for the removal of natural-gas fired infrared tube heaters and replacement with a combined hot air, boiler heating system. The organization serves and maintains locations in Adams, Columbia, Cumberland, Dauphin, Franklin, Harrisburg City, Montour, Northumberland, Perry, Snyder, Union and York Counties. This solicitation covers only the York County Location.

    From: Capital Area Transit (Transportation)

  • C1DZ--Install 25,000-Gal Reserve Fuel Tank for Boiler Plant

    Type : Award

    Due : 18 Feb, 2023 (14 months ago)
    Posted : 21 months ago
    Started : 19 Jan, 2023 (15 months ago)

    Atlanta VAMC uses four (4) Cleaver Brooks high-pressure, 10,000 BTU/hr, dual-fuel fired, fire tube boilers installed in 2015. Based on historical consumption data, the facility requires 6348 MMBTU to operate for 10-days in January. At 0.1396 MMBTU/gal, the facility requires 45,5000 gallons of fuel for 10-days of normal operation. A third existing 25,000-gal UST (Fuel Tank #3) is scheduled to be re-commissioned in 2023.

    From: Federal Government (Federal)

  • Paving Building Fire Suppression System

    Type : Bid Notification

    Due : 31 Jan, 2019 (about 5 years ago)
    Posted : about 5 years ago
    Started : 23 Jan, 2019 (about 5 years ago)

    Where the building is protected with a fire alarm system, this interlock shall be in accordance with the requirements of NFPA 72.Three gas-fired infrared tube heaters will need to be incorporated with the design of the sprinkler system and in accordance with NFPA 54. Manufacturer, Dayton; Model 7D849 150,000 BTUHQuotes are due by January 31, 2019 at 9am Mountain Time. Contact Information: Rachel A.

    From: Federal Government (Federal)