Search results for: fishing and canoe

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 50
  • MN-Replace Fishing and Canoe Launch Platforms

    Type : Bid Notification

    Due : 02 Jul, 2021 (about 2 years ago)
    Posted : about 2 years ago
    Started : 05 Jun, 2021 (about 2 years ago)

    The work includes but is not limited to: project mobilization and demobilization, project management and oversite, demolition, construction of items described below, quality control, cleanup, and removal of all debris and waste generated during performance of the work.The work includes, but is not limited to:1-Demolish two fishing platforms and replacing with new fishing platforms;2-Demolish one canoe launch platform and replace with new canoe launch

    From: Federal Government (Federal)

  • Invasive Species Chemical Treatment for Properties in the Greenways & Natural Lands Program

    Type : Bid Notification

    Due : 08 May, 2024 (in 2 days)
    Posted : 23 days ago
    Started : 10 Apr, 2024 (24 days ago)

    If left uncontrolled they can destroy ecosystems, limit wildlife habitat, agriculture, cultivated landscapes, hunting, fishing, boating, camping, and swimming.TimelineRelease Project Date:April 10, 2024Pre-Proposal Meeting (Mandatory):April 25, 2024, 9:00am Yarborough Nature Center - 3485 N CR 426, Geneva, FL 32732Question Submission Deadline:April 29, 2024, 5:00pmProposal Submission Deadline:May 8, 2024, 2:00pm

    From: Seminole (County)

  • Concession Services at Fort De Soto Park

    Type : Bid Notification

    Due : 23 May, 2024 (in 17 days)
    Posted : 9 days ago
    Started : 25 Apr, 2024 (9 days ago)

    The Park boasts two fishing piers, a 238-site campground, a 32-lane boat launch, multiple picnic areas, a 6.8-mile paved shared use trail, nature trail, canoe/kayak trail, a historic fort, a pet park with beach access, and miles of undisturbed beach. Visitors enjoy boating, kayaking, bicycling, beach-going, nature appreciation, camping, heritage tourism, fishing, picnicking, and numerous other outdoor activities.

    From: Pinellas (County)

  • Design of Waterfront Facilities and Amenities

    Type : Bid Notification

    Due : 25 Oct, 2022 (18 months ago)
    Posted : 19 months ago
    Started : 28 Sep, 2022 (19 months ago)

    Included among these facilities and amenities are a new boat ramp on Pretty Lake at Shore Drive, and a new fishing pier adjacent to the Granby Street Bridge. In addition to these two projects, the City may use the services of the selected firm for design, rehabilitation, or repair of other boat ramps, piers, kayak & canoe launches, docks, promenades, or related facilities.

    From: Norfolk (City)

  • Design of Waterfront Facilities and Amenities

    Type : Bid Notification

    Due : 25 Oct, 2022 (18 months ago)
    Posted : 19 months ago
    Started : 28 Sep, 2022 (19 months ago)

    Included among these facilities and amenities are a new boat ramp on Pretty Lake at Shore Drive, and a new fishing pier adjacent to the Granby Street Bridge. In addition to these two projects, the City may use the services of the selected firm for design, rehabilitation, or repair of other boat ramps, piers, kayak & canoe launches, docks, promenades, or related facilities.

    From: Norfolk (City)

  • Request for Qualifications - South Point Landing

    Type : Bid Notification

    Due : 10 Jan, 2024 (3 months ago)
    Posted : 4 months ago
    Started : 21 Dec, 2023 (4 months ago)

    Duke Energy is currently constructing a canoe and kayak launch with associated parking along the east shore of the park. In order for Gaston County to better oversee and operate the park, a pre-fabricated guard shack will be installed along Boat Launch Rd. The site will need to be designed to prepare for the installation of the guard shack, including utility connection and widening of the road to allow for entering and exiting traffic.

    From: Gaston (County)

  • CP-24-001 Professional Services for River Park Improvements

    Type : Bid Notification

    Due : 15 May, 2024 (in 9 days)
    Posted : 24 days ago
    Started : 11 Apr, 2024 (24 days ago)

    As conceptualized, the River Park project will include removal of the Cumberland Industrial Dam and the development, construction, and landscaping of whitewater features, green space, trails and trail connections, canoe/kayak access, viewing areas, parking, murals, and fishing access to the North Branch.One aspect of the River Park project is the planned removal of the Cumberland Industrial Dam, which currently presents an obstacle to navigation along

    From: Maryland (State)