Type : Bid Notification
Spring or King tidal water levels can exceed normal high tides by several feet and thereby cause extensive roadway, potential structure and the nuisance flooding of adjacent low-lying areas more than once a day for several hours at each peak tide occurrence. The proposed Dodecanese Boulevard Tidal Flooding Improvements Project has been prepared to resolve the tidallyinfluenced (sunny-day) flooding within these areas.