Search results for: floor building

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 19,369
  • REQUEST FOR INFORMATION - Painting Anechoic Chamber Floor Building 1030

    Type : Bid Notification

    Due : 29 Apr, 2024 (Tomorrow)
    Posted : 4 days ago
    Started : 26 Apr, 2024 (1 day ago)

    PLEASE DO NOT REQUEST A COPY OF A SOLICITATION, AS ONE DOES NOT EXIST. - REQUIREMENTS – Requirement for Painting and Epoxy Coating installation for the Anechoic Chamber Floor Building 1030.The objective of this requirement is to secure the services of a qualified contractor to install an epoxy coating on a portion of the concrete and metal floor areas in Building 1030, Edwards Air Force Base (EAFB), California.

    From: Federal Government (Federal)

  • 614-19-106 RENOVATE 1ST FLOOR BUILDING 1 PHYSICAL MEDICINE & REHAB

    Type : Contract

    Due : 03 Jan, 2025 (in 8 months)
    Posted : 4 months ago
    Started : 26 Dec, 2023 (4 months ago)

    614-19-106 RENOVATE 1ST FLOOR BUILDING 1 PHYSICAL MEDICINE & REHAB Solicitation ID/Procurement Identifier: 36C24921D0051 Ultimate Completion Date: Fri Jan 03 18:00:00 GMT 2025

    From: Federal Procurement Data System (Federal)

  • Y1DA--Construct 3rd Floor Building #2 and Renovate 1st Floor 539-333

    Type : Bid Notification

    Due : 30 Mar, 2021 (about 3 years ago)
    Posted : about 3 years ago
    Started : 29 Mar, 2021 (about 3 years ago)

    electrical work, and certain other items shown and specified in project drawings and specifications.This construction project will renovate 4,000 SF of space on the first floor building 1 to create additional Primary Care space and construct 20,000 SF of administrative space creating a 3rd floor on the CLC building.

    From: Federal Government (Federal)

  • C1DA--Construct E-Wing 5th Floor Building 1 for Dental Clinic - Providence

    Type : Pre-Bid Notification

    Due : 17 Nov, 2023 (5 months ago)
    Posted : 6 months ago
    Started : 31 Oct, 2023 (6 months ago)

    The project experience should demonstrate knowledge/experience in site security and building reinforcement with respect to vehicular intrusion and hurricane hardening (Category 3 or higher); structural design of multi-story buildings, with extensive experience in designing additional habitable floors and mechanical penthouses to existing multi-story buildings which remained occupied during construction; clinical spaces associated with expansion of

    From: Federal Government (Federal)

  • 24-1588 Supply and Delivery of 2035 Plastic Tanks for Drip Tank Units

    Type : Bid Notification

    Due : 10 May, 2024 (in 12 days)
    Posted : 10 days ago
    Started : 15 Apr, 2024 (12 days ago)

    Trade agreements Canadian Free Trade Agreement (CFTA) Canada-European Union Comprehensive Economic and Trade Agreement (CETA) Contracting organization Organization The City of Calgary Address 677 25 AVE SE 2nd floor Building U Calgary, Alberta, T2P 2M5 Canada Contracting authority Gus Brandao Phone 403-268-2704 Email gus.brandao@calgary.ca Address 677 25 AVE SE 2nd floor Building U Calgary

    From: Canada (Federal)

  • Resurface Floor - Building D - Washburn Tech

    Type : Bid Notification

    Due : 10 Apr, 2023 (12 months ago)
    Posted : 13 months ago
    Started : 27 Mar, 2023 (13 months ago)

    REQUEST FOR PROPOSAL (RFP) RFP 23061 RESURFACE FLOORBUILDING D – WASHBURN INSTITUTE OF TECHNOLOGY RFP Number: The above Request for Proposal Number has been assigned to the Request and MUST be shown on all correspondence or other documents associated with this Request and MUST be referred to in all verbal and written communications.

    From: Washburn University of Topeka (Higher Education)

  • 36C77623R0018 - C1DA--Construct E-Wing 5th Floor Building 1 for Dental Clinic - Providence

    Type : Pre-Bid Notification

    Due : 01 Dec, 2023 (4 months ago)
    Posted : 5 months ago
    Started : 31 Oct, 2023 (6 months ago)

    The project experience should demonstrate knowledge/experience in site security and building reinforcement with respect to vehicular intrusion and hurricane hardening (Category 3 or higher); structural design of multi-story buildings, with extensive experience in designing additional habitable floors and mechanical penthouses to existing multi-story buildings which remained occupied during construction; clinical spaces associated with expansion of

    From: Federal Government (Federal)