Search results for: flow meter and vault

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 242
  • Calafia Pump Station Flow Meter and Vault Replacement

    Type : Bid Notification

    Due : 01 Dec, 2022 (16 months ago)
    Posted : 16 months ago
    Started : 14 Nov, 2022 (16 months ago)

    Furnish and install a larger precast concrete meter vault, piping and electrical conduits and wiring and install new flow meter and transmitter (both provided by City) and sump pump (provided by City) for a fully functional system. Other Details Notes Special Notices Local Programs & Policies Place eBid

    From: San Clemente (City)

  • MSP Lift Station Project

    Type : Bid Notification

    Due : 08 Apr, 2024 (in 10 days)
    Posted : 21 days ago
    Started : 06 Mar, 2024 (22 days ago)

    The City of Wentzville is requesting sealed bids from qualified contractors for the MSP Lift Station Project which consists of construction of a submersible pump station with valve vault and electrical room, construction of a flow meter vault, construction of a diversion structure, demolition of a pump station and all associated civil, structural, architectural, mechanical and electrical work.

    From: Wentzville (City)

  • Route 36 Flow Meter Vault Improvements

    Type : Bid Notification

    Due : 15 Jul, 2020 (about 3 years ago)
    Posted : about 3 years ago
    Started : 11 Jun, 2020 (about 3 years ago)

    See more details...

    From: Villager Construction New York (Co-op)

  • RFB 5591 Mary Rhodes Pipeline Ph. 1 System Improvements, E13037

    Type : Bid Notification

    Due : 03 Apr, 2024 (in 4 days)
    Posted : 1 month ago
    Started : 29 Jan, 2024 (2 months ago)

    . • Remove hydro-pneumatic valve actuators on the pump discharge flow control valves and replace with new electric motor valve actuators for four existing pump trains and one new pump train. • A new electro-magnetic flow meter within a new concrete vault, associated connections to the existing pipeline, and electrical and signal cabling and conduits. • New sump pumps: three in existing valve vaults and one in the new meter vault, and associated controllers

    From: Corpus Christi (City)

  • Phase 1 Sewer System Improvement

    Type : Bid Notification

    Due : 17 Apr, 2024 (in 19 days)
    Posted : 1 day ago
    Started : 26 Mar, 2024 (2 days ago)

    Complete replacement of existing master meter that monitors wastewater flow from the Town of Halifax to the Town of Weldon. This will include the installations of new vault meter piping and other related components.

    From: North Carolina Electronic (Other)

  • various improvements white lodge treatment facility

    Type : Bid Notification

    Due : 03 Dec, 2020 (about 3 years ago)
    Posted : about 3 years ago
    Started : 05 Nov, 2020 (about 3 years ago)

    Replacement of Chemical Pumps, demolish Temporary Feed System, install Permanent Feed System, Insulation of piping, replacement of stainless-steel piping with flanged ductile iron pipe, install new magnetic flow meter and pressure transducer from the outside vault to within the treatment plant piping trough, replacement of four chemical feed injectors downstream of the flow meter; replacement of venturi flow meter with magnetic flow meter

    From: Massachusetts (State)

  • various improvements white lodge treatment facility

    Type : Bid Notification

    Due : 03 Dec, 2020 (about 3 years ago)
    Posted : about 3 years ago
    Started : 22 Oct, 2020 (about 3 years ago)

    Pre Bid Conference: Pre Bid Conference: Bulletin Desc: Replacement of Chemical Pumps, demolish Temporary Feed System, install Permanent Feed System, Insulation of piping, replacement of stainless-steel piping with flanged ductile iron pipe, install new magnetic flow meter and pressure transducer from the outside vault to within the treatment plant piping trough, replacement of four chemical feed injectors downstream of the flow meter

    From: Massachusetts (State)