Search results for: flow meter and vault

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 246
  • Calafia Pump Station Flow Meter and Vault Replacement

    Type : Bid Notification

    Due : 01 Dec, 2022 (17 months ago)
    Posted : 17 months ago
    Started : 14 Nov, 2022 (17 months ago)

    Furnish and install a larger precast concrete meter vault, piping and electrical conduits and wiring and install new flow meter and transmitter (both provided by City) and sump pump (provided by City) for a fully functional system. Other Details Notes Special Notices Local Programs & Policies Place eBid

    From: San Clemente (City)

  • Route 36 Flow Meter Vault Improvements

    Type : Bid Notification

    Due : 15 Jul, 2020 (about 3 years ago)
    Posted : about 3 years ago
    Started : 11 Jun, 2020 (about 3 years ago)

    See more details...

    From: Villager Construction New York (Co-op)

  • various improvements white lodge treatment facility

    Type : Bid Notification

    Due : 03 Dec, 2020 (about 3 years ago)
    Posted : about 3 years ago
    Started : 05 Nov, 2020 (about 3 years ago)

    Replacement of Chemical Pumps, demolish Temporary Feed System, install Permanent Feed System, Insulation of piping, replacement of stainless-steel piping with flanged ductile iron pipe, install new magnetic flow meter and pressure transducer from the outside vault to within the treatment plant piping trough, replacement of four chemical feed injectors downstream of the flow meter; replacement of venturi flow meter with magnetic flow meter

    From: Massachusetts (State)

  • MSP Lift Station Project

    Type : Bid Notification

    Due : 08 Apr, 2024 (21 days ago)
    Posted : 1 month ago
    Started : 06 Mar, 2024 (1 month ago)

    The City of Wentzville is requesting sealed bids from qualified contractors for the MSP Lift Station Project which consists of construction of a submersible pump station with valve vault and electrical room, construction of a flow meter vault, construction of a diversion structure, demolition of a pump station and all associated civil, structural, architectural, mechanical and electrical work.

    From: Wentzville (City)

  • Trinity River Authority of Texas - Central Regional Wastewater System Meter Station Rehabilitation Group 1 Meter Station MS 10.0B

    Type : Bid Notification

    Due : 14 Sep, 2022 (19 months ago)
    Posted : 20 months ago
    Started : 30 Aug, 2022 (20 months ago)

    Details ID: 3110.2014C Estimate: Type: Wastewater Flow Meter Station Rehabilitation Owner: Trinity River Authority of Texas Location Tarrant County, TX Map Code: Show Google Map Open Map On Google No Map Scope The project scope includes, but is not limited to, the following major work items: · Rehabilitation of existing meter vault and electrical instrumentation · Installation of open-channel flow meter · Installation of 100 linear feet of 24-inch

    From: Trinity River Authority of Texas (Utilities)

  • Lift Station 2C Improvements Project

    Type : Bid Notification

    Due : 02 May, 2024 (in 3 days)
    Posted : 22 days ago
    Started : 04 Apr, 2024 (24 days ago)

    Work includes one new cast-in-place sub-grade wet well, one new cast-in-place subgrade valve vault, one new precast concrete subgrade flow meter vault, installation of subgrade piping, construction of one new electrical building, installation of new oxygen injection system, installation of Owner supplied diesel generator with subbase fuel tank, associated piping modifications, associated electrical system modifications, site improvements including

    From: Municipal Research and Services Center (Other)

  • MSP Lift Station Project

    Type : Bid Notification

    Due : 16 Apr, 2024 (13 days ago)
    Posted : 1 month ago
    Started : 06 Mar, 2024 (1 month ago)

    The City of Wentzville is requesting sealed bids from qualified contractors for the MSP Lift Station Project which consists of construction of a submersible pump station with valve vault and electrical room, construction of a flow meter vault, construction of a diversion structure, demolition of a pump station and all associated civil, structural, architectural, mechanical and electrical work.

    From: Wentzville (City)