Type : Bid Notification
Bid Details Planholder U.S. 1 12" Forcemain HDD Culvert Crossing and Forcemain Out of Service Projec Active Download Bid Package Bid Details Agency Name City of St.
Bid Details Planholder U.S. 1 12" Forcemain HDD Culvert Crossing and Forcemain Out of Service Projec Active Download Bid Package Bid Details Agency Name City of St.
INVITATION FOR BIDS CRANE CROSSING PHASE 2 Sealed bids will be received in a sealed envelope or via CivCast and addressed to Kaufman County Fresh Water Supply District No. 3 (“Owner”) via the design engineer Kimley-Horn and Associates, Inc. at 6160 Warren Parkway, Suite 210, Frisco, Texas 75034 until 3:00 PM CST, Tuesday, May 21 st, 2024 and then publicly opened and read, for the work necessary for clearing, grading, utility, & paving construction
The Work is to be in accordance with the terms and conditions outlined herein.The project includes the construction of the John Hart Forcemain as follows: Installation of approximately 1020 m of 450 mm ø SDR25 PVC (material will be supplied by City).
The Work is to be in accordance with the terms and conditions outlined herein.The project includes the construction of the John Hart Forcemain as follows:Installation of approximately 1020 m of 450 mm ø SDR25 PVC (material will be supplied by City).Installation of approximately 260 m of 450 mm ø SDR18 Fused PVC including 220 m aerial crossing of the Nechako River along the underside of the Highway 97 (John Hart) Bridge (material will be supplied by
to solicitation details & future business opportunities. to solicitation details & future business opportunities. Pre-Bidding Events: to solicitation details & future business opportunities.
The Town of Chittenden is accepting proposals for the replacement of a 30" CMP culvert with a 57" x 38" polymer coated CMP arch pipe in an improved alignment. The project is located on Mountain Top Road, adjacent to the intersection with a private road called Horton Hill. The project scope includes temporary diversion of stream flow, removal of existing culvert, pipe installation, concrete headwalls/wingwalls and guardrails.
Mountain Top Road Culvert #9 Replacement postdate:- 06/06/2023 04:17 AM EDT responsedate:- 07/06/2023 03:00 PM EDT Solicitation Number:- Locked Registered members only to solicitation details & future business opportunities.