Type : Bid Notification
; Forcemain Improvements (PDF) Complete digital documentsReturn to full list >>
; Forcemain Improvements (PDF) Complete digital documentsReturn to full list >>
Click Here for Bid Tab BID NOTICE INVITATION FOR BIDS BID NUMBER: PW-2223-17 PRATT BLVD FORCEMAIN IMPROVEMENTS PROJECT The Village of Elk Grove Village will receive sealed bids for approximately 380 linear feet of forcemain replacement of the Pratt Blvd forcemain, and all incidental and collateral work necessary to complete the project within Village limits as shown on plans and as described in Specifications, Plans and Contract Document PW-2223-17
BID NOTICE INVITATION FOR BIDS BID NUMBER: PW-2223-17 PRATT BLVD FORCEMAIN IMPROVEMENTS PROJECT Click here for work history statement (pre-qualification form).
Bid Details Bid Information Agency Marion County Procurement Services Bid Type Invitation to Bid Bid Number ITB-18B-212-0-2018/CH Fiscal Year 2018 Bid Writer Carrie Hyde Bid Name 18B-212 CR 464 Forcemain Improvements Phase 2 Bid Status Active Bid Status Text None Due Date/Time 8/22/2018 3:00 PM Eastern Broadcast Date 7/11/2018 Bid Bond 5% Project Estimated Budget $706,000.00 Plan (blueprint) Distribution Options None Distribution Method Download
Bid Details Planholder FKAA PROJECT NUMBER 4090-21 KEY HAVEN WASTEWATER FORCEMAIN IMPROVEMENTS PHASE 2 Active Browse Awarded Bids Download Bid Package Bid Details Agency Name Florida Keys Aqueduct Authority Bid Writer David Jackson Bid ID PJ-Project 4090-21-0-2023/DJ Bid Type PJ - Project Broadcast Date 12/20/2022 4:06 PM Eastern Fiscal Year 2023 Due Date 01/31/2023 2:00 PM Eastern Bid Status Text None Scope of Work None Documents Download all documents
Improvements as further described in Section A of the RFP Particulars (Appendix B) (the “Deliverables”).
(IPS) Forcemain including prefabricated bends, air vacuum valve assemblies, connection to existing Foster Wells Pump Station and existing PWRF facility, and associated items. This project also includes approximately 300 feet of horizontal directional drilling under State Highway 395. Additive Bid Schedule B: Construction of approximately 5,750 LF dual Forcemain (11,500 LF Total Pipe) of HDPE, DR 11, 20-inch diam.