Search results for: forward alignment

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 18
  • Machining of one final Columbia (CLB) Forward Alignment Ring (FAR)

    Type : Bid Notification

    Due : 25 Jan, 2023 (15 months ago)
    Posted : 15 months ago
    Started : 19 Jan, 2023 (15 months ago)

    The Naval Surface Warfare Center Carderock Division (NSWCCD) requires the machining of one COLUMBIA Class (CLB) Forward Alignment Ring Machining to support on-time delivery of a full scale CLB propulsor. The machining of a Forward Alignment Ring requires a facility with approved classified safeguarding and CNC machining capabilities appropriately as described in the Performance Work Statement (PWS) and IAW drawings.

    From: Federal Government (Federal)

  • RE-TREE Toledo Project Grant Consultant

    Type : Bid Notification

    Due : 13 Feb, 2024 (2 months ago)
    Posted : 3 months ago
    Started : 26 Jan, 2024 (3 months ago)

    with Forward Toledo plan • Coordination with KTLCB, Woodlawn Foundation, and Toledo Public Schools on alignment with public education campaign and youth workforce development program • Development of an intake and selection process for residential tree planting program • Development of an outreach strategy, in coordination with KTLCB, the City of Toledo’s Department of Marketing and Communications, and communications consultant With the submission

    From: Toledo (City)

  • Flow cytometer

    Type : Award

    Due : 27 Aug, 2019 (about 4 years ago)
    Posted : about 4 years ago
    Started : 07 Sep, 2019 (about 4 years ago)

    At least Six fluorescent channels (similar to 530/572/675/780 nm off the 488 nm laser and 675/780 nm off the 640 nm laser) in addition to forward and side scatter channels. 3. Fixed optical alignment 4. Volumetric fluidics for cell counting 5. 24-bit data collection with dynamic range of six or more decades 6. Control software with manual and automated compensation ability 7.)

    From: Federal Government (Federal)

  • Combatant Craft Division Subsystems Assessment Event (AE)

    Type : Bid Notification

    Due : 11 Apr, 2023 (12 months ago)
    Posted : 13 months ago
    Started : 10 Mar, 2023 (13 months ago)

    Side bumpers and a forward bump stop are utilized for vehicle alignment. The purpose of the pneumatic subsystem is to enable the craft to change draft for vehicle L&R operations. The pneumatic subsystem consists of inflatable panels (along the hull sides and bottom), hoses, a control panel, and other hardware required for the inflation/deflation of panels.

    From: Federal Government (Federal)

  • Public Meeting-Richardson Highway MP 159-173 Recon...

    Type : Bid Notification

    Due : 30 May, 2018 (about 6 years ago)
    Posted : about 6 years ago
    Started : 18 May, 2018 (about 6 years ago)

    DOT&PF has accepted this proposal and is moving forward in developing the preliminary road re-alignment design. This decision eliminates the need to acquire right-of-way (property) from private land owners along the Meiers Lake corridor.The DOT&PF anticipates construction of the first segment (milepost 159-167) could begin the spring of 2019.                             

    From: Alaska (State)

  • 10--Tactical Spotter Kits

    Type : Bid Notification

    Due : 24 Feb, 2020 (about 4 years ago)
    Posted : about 4 years ago
    Started : 23 Feb, 2020 (about 4 years ago)

    The forward “Z” Rail is stepped-up for the alignment of Leupold Mk4 12-40x60mm Tactical Spotting Scope with a variety of military-issue NV devices such as CNVD-T's, PVS-22's, PVS-24's, etc. No need to modify the existing interfaces on the devices, providing they are designed to interface with MIL-STD-1913 rails.

    From: Federal Government (Federal)

  • Suspension Repairs T01-259 Wheeler

    Type : Contract

    Due : 03 Jan, 2024 (3 months ago)
    Posted : 4 months ago
    Started : 28 Dec, 2023 (4 months ago)

    It was noted on further inspection by the vendor that the wheeler needed the rear suspension re- bush kit along with the all-wheel alignment. The decision to move forward with the repairs was made consistent with MDOT managements guidance considering T01-259 is 2014 international wheeler with 116210 miles. The repairs were made @ $5,791.28. The estimated replacement cost is $250.000 and is not scheduled for replacement yet.

    From: Maine (State)