Type : Contract
DRS EMERGENCY FREEWAY CLOSURE GATES - MnDOT TRAFFIC AND PARKING CONTROL 4/30/2024
DRS EMERGENCY FREEWAY CLOSURE GATES - MnDOT TRAFFIC AND PARKING CONTROL 4/30/2024
NUMBER: 31339 PURCHASING AGENCY: Admin/State Procurement SOLICITATION NUMBER: 2000012793 Solicitation Event Version:1 TITLE: Emergency Freeway Closure Ramp Gates RESPONSE TO THIS SOLICITATION IS DUE NO LATER THAN4/5/2022 AT3:00 PM Central Time SHIP TO ADDRESS:See Solicitation Document This Solicitation Event is being conducted in the SWIFT system. Log in to the Supplier Portalto view this event. You will need to search for Event ID 2000012793.
Each bridge will be removed during a full weekend freeway closure (1 closure per bridge). The SR-520 freeway will need to be protected during demolition. Details
CLOSURE OPERATION IN INTERSECTION (TTC-28.0) NIGP Code: 96884 Traffic Control Services (To Include Placement and Removal of Control Devices) Quantity: 5.00000 Day Delivery Date: l1_11. TOTAL FREEWAY CLOSURE OPERATION (TTC-46.0,TTC-47.0) NIGP Code: 96884 Traffic Control Services (To Include Placement and Removal of Control Devices) Quantity: 5.00000 Day Delivery Date: l1_12.
CLOSURE OPERATION IN INTERSECTION (TTC-28.0) NIGP Code: 91371 Maintenance and Repair, Highway and Road (To include the removal of asphalt, concrete, bitumens, etc) Quantity: 5.00000 Day Delivery Date: l1_11. TOTAL FREEWAY CLOSURE OPERATION (TTC-46.0,TTC-47.0) NIGP Code: 91371 Maintenance and Repair, Highway and Road (To include the removal of asphalt, concrete, bitumens, etc) Quantity: 5.00000 Day Delivery Date: l1_12.
Supplier Address Anderson Perry & Assoc., Inc 1901 n fir La Grande, Oregon 97850 Contactandrew lindseyPhone1 (541) 9638309Fax Emailalindsey@andersonperry.com Contract # 730-B38291-21 Agreement Start Date 04/26/2021 Expiration Date 01/23/2024 Supplier Number 84576 All dates are mm/dd/yyyy Header Comments The scope of this Project is to install gates, signs, cameras, and illumination on Interstate 84 between mile points (MPs) 210 and 216 to improve communication with the traveling public, improve traffic circulation, and mitigate the safety hazards to ODOT employees during freeway closure events. The Project includes ground disturbance throughout the entire corridor to install gates, signs, luminaires, ...
An ICM event is categorized by a freeway or ramp closure that forces traffic to divert onto adjacent arterial roadways. REACT responders will work with state and local public safety and traffic operations staff to establish detour routes and support safe diversion of traffic onto these routes and back onto the freeway upstream of the closure.