Type : Contract
A&E DESIGN SERVICES - UPGRADE FREIGHT ELEVATORS BLDGS 4 & 7, PROJECT NO. 504-22-102 Solicitation ID/Procurement Identifier: 36C25722R0007 Ultimate Completion Date: Sun Jan 03 18:00:00 GMT 2027
A&E DESIGN SERVICES - UPGRADE FREIGHT ELEVATORS BLDGS 4 & 7, PROJECT NO. 504-22-102 Solicitation ID/Procurement Identifier: 36C25722R0007 Ultimate Completion Date: Sun Jan 03 18:00:00 GMT 2027
Remove and Replace Hoisting Cables for Freight Elevator UW25-04-09 5/2/2024 4/9/2024 4/22/2024 at 12:00 PM
The intention of the project is to modify the existing freight elevator in SLAC bldg 950 to make it fir for passenger use, not general public per ASME 17.1.
This request for proposal is only open to contractors on the Design-Build (DB) / Design-Bid-Build (DBB), Indefinite Delivery / Indefinite Quantity (IDIQ) 8(a) Multiple Award Construction Contract (MACC) for New Construction, Renovation, Alteration, and Repairs for General Construction Projects in the Hampton Roads Integrated Product Team (IPT) Area of Responsibility (AOR), under contract numbers N40085-17-D-0325/0326/0327/0328: J.W. Clark Enterprises, Inc., McFarland Atlantic Construction, Safeco-Ocean JV, LLC, and Turner Strategic Technologies, LLC.Please see attached General Requirements and Attachments A - L.
STATEMENT OF WORK Minneapolis Veteran Affairs Health Care System Repair Freight Elevator Sill Plate General: ONE on site assessment is authorized to evaluate the work to be performed and provide the most accurate price quote. Assessment must be completed prior to the closing date of the solicitation. Sill plate for the freight elevator in Bldg 70, 4th floor needs to be repaired.
The General Services Administration, Public Building Service, Greater Southwest Region 7, Acquisition Management Division, intends to Issue a Request for Proposal (RFP) for the moderization of three (3) existing public passenger elevators, and one (1) service elevator at the John M. Shaw U.S. Courthouse, 800 Lafayette Street, Lafayette, LA 70501.
The work to be performed in association with this project includes the following scope:19 Replace Bldg. 4 West Freight ElevatorThe contractor shall provide all labor, materials, equipment to remove the existing West Freight Elevator in Building 4 and replace with a new electric traction freight elevator at FMC Rochester.