Type : Bid Notification
This project consists of relocating the fresh air intake that serves air handling unit 200 of the 10 Wellington tower. The consultant shall review both the existing fresh air intake location and size and exhaust openings/louvre locations and size on the roof and relocate the fresh air intake to possibly the middle of the west façade. The consultant shall... See more