Search results for: ftbr mtn quarry bridge

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 16
  • CA FTBR PONDEROSA BRIDGE(1) PONDEROSA BRIDGE REPLACEMENT & CA FTBR MTN QUARRY BRIDGE IMPROVEMENTS

    Type : Bid Notification

    Due : 10 Nov, 2022 (17 months ago)
    Posted : about 2 years ago
    Started : 26 Feb, 2022 (about 2 years ago)

    All questions arising from the contractor site-visits must be submitted in writing TO: CFLContracts@dot.gov and will be answered on the SAM.GOV website.CA FTBR Ponderosa Bridge (1) Ponderosa Bridge Replacement and CA FTBR Mtn Quarry Bridge ImprovementsPROJECT DESCRIPTION:Ponderosa Bridge (Bid Schedule A):The project scope includes replacing the Ponderosa Way Bridge and minor roadway improvements

    From: Federal Government (Federal)

  • CA FTBR MTN QUARRY BRIDGE BRIDGE IMPROVEMENTS&CA FTBR PONDEROSA BRIDGE (1) PONDEROSA BRIDGE REPLACEMENT ...

    Type : Contract

    Due : 31 Mar, 2021 (about 3 years ago)
    Posted : about 4 years ago
    Started : 21 Jan, 2020 (about 4 years ago)

    CA FTBR MTN QUARRY BRIDGE BRIDGE IMPROVEMENTS&CA FTBR PONDEROSA BRIDGE (1) PONDEROSA BRIDGE REPLACEMENT 100% DESIGN TASK ORDER Solicitation ID/Procurement Identifier: DTFH6816D00006 Ultimate Completion Date: Wed Mar 31 17:00:00 GMT 2021

    From: Federal Procurement Data System (Federal)

  • CA FTBR (1) Ponderosa Bridge & Mtn. Quarry Bridges

    Type : Pre-Bid Notification

    Due : 06 Apr, 2022 (about 2 years ago)
    Posted : about 2 years ago
    Started : 22 Mar, 2022 (about 2 years ago)

    SOURCES SOUGHT: 6982AF22SS000003SOLICITATION NUMBER: 6982AF22B000007PROJECT DETAILS:  CA FTBR (1) Ponderosa Bridge & Mtn. Quarry BridgesTHIS PROJECT WILL BE ADVERTISED AS SMALL BUSINESS SET-ASIDETHIS IS NOT A REQUEST FOR BID - PLANS AND SPECIFICATIONS ARE NOT AVAILABLE.PROJECT NUMBER:  CA FTBR (1)PROJECT NAME:  Ponderosa Bridge & Mtn.

    From: Federal Government (Federal)

  • CA FTBR (1) Ponderosa Bridge & Mtn. Quarry Bridges

    Type : Award

    Due : 30 Jun, 2022 (22 months ago)
    Posted : 22 months ago
    Started : 16 Jun, 2022 (22 months ago)

    Product Service Code:- Y1LB - CONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS NAICS Code:- 237310 - Highway, Street, and Bridge Construction Primary point of contact:- Eric Grosskreuz cflacquisitions@dot.gov Secondary point of contact:- Sheri Walsh cflacquisitions@dot.gov

    From: Federal Government (Federal)

  • North Suspension Footbridge Foundations Rehab

    Type : Bid Notification

    Due : 25 Apr, 2024 (3 days ago)
    Posted : 17 days ago
    Started : 10 Apr, 2024 (18 days ago)

    The Schedule of Work shall indicate proposed progress in 1-week periods for at least the following work as applicable:  Mobilization and installation of temporary bracing to stable existing A-frames of bridge;  Installation of temporary floating work platform(s) and containment systems for watercourse protection;  Installation of micropiles;  Installation of steel supporting frame to connect micropile foundation to existing A-frames of bridge;

    From: Ramara (Town)

  • Req 40344 - Metal Bridges for Gibson Lake trail as per included IFT drawings

    Type : Bid Notification

    Due : 10 Aug, 2023 (8 months ago)
    Posted : 8 months ago
    Started : 31 Jul, 2023 (9 months ago)

    Req 40344 - Metal Bridges for Gibson Lake trail as per included IFT drawings IMPORTANT: If submitting by email or fax, Proponents submission must include the following completed documents as required to be considered:ITQ Submission Declaration Form Response Form - Questionnaire Response Form - Quotation Any other form or document identified as being mandatory in the Opportunity. Contract duration Refer to the description above for full details.

    From: Canada (Federal)

  • for constructing the Bridge Structural Repairs, Bridge Painting, Bridge Guardrail Retrofit on the I-65 Bridges (Northbound and South...

    Type : Bid Notification

    Due : 29 Sep, 2023 (7 months ago)
    Posted : 6 months ago
    Started : 06 Sep, 2023 (7 months ago)

    for constructing the Bridge Structural Repairs, Bridge Painting, Bridge Guardrail Retrofit on the I-65 Bridges (Northbound and Southbound Roadways) over the Tennessee River. Length 2.000 mi.

    From: Alabama Department of Transportation (Transportation)