Search results for: gangway

Refine your Search
Apply several filters to get precise search results

People also searched for

pedestrian bridgemanufactured bridge
Showing opportunity 1 - 8 of 8
  • Boat Docking and <b>Gangways</b>

    Boat Docking and Gangways

    Type : Bid Notification

    Due : 29 Mar, 2024 (Today)
    Posted : 11 days ago
    Started : 15 Mar, 2024 (13 days ago)

    P3 Single Gangway - 4 foot 1 EA - Each Single gangway; 4-foot inside width by 40-foot long. Delivery and installation included. P4 Single Gangway - 6 foot 1 EA - Each Single gangway; 6-foot inside width by 20-foot long. Delivery and installation included. P5 Single Gangway - 6 foot 1 EA - Each Single gangway; 6-foot inside width by 30-foot long. Delivery and installation included.

    From: Utah (State)

  • AC Floating Docks, Fixed Piers & <b>Gangways</b>

    AC Floating Docks, Fixed Piers & Gangways

    Type : Bid Notification

    Due : 29 Mar, 2024 (Today)
    Posted : 13 days ago
    Started : 27 Feb, 2024 (1 month ago)

    Pursuant to the State Purchasing Act (Official Code of Georgia Annotated §§50-5-50 et seq.), this electronic Request for Quotes (eRFQ) is being issued to establish an open agency contract with multiple qualified suppliers who will provide Floating Docks, Fixed Piers & Gangways to include manufacturing and/or supplying pre-fabricated floating docks, fixed piers, gangways, pile guides, cleats, fenders, utility routing/anchorage systems and other marine

    From: Georgia (State)

  • Southside Marine Center Phase II

    Type : Bid Notification

    Due : 25 Mar, 2024 (3 days ago)
    Posted : 15 days ago
    Started : 22 Feb, 2024 (1 month ago)

    Description Scope of work generally consists of landside development of the Southside Marine Center including a diesel fuel tank and delivery system to the floating dock, slop tank and delivery systems from the floating dock to a landside storage tank, security fencing, automated 30’ cantilever and swing gates with card readers, two pedestrian gates, power rack for future operations building, and a concrete operating pad with access sidewalk to the dock gangway

    From: Corpus Christi (Port)

  • Marine Infrastructure Condition Surveys

    Type : Bid Notification

    Due : 26 Mar, 2024 (2 days ago)
    Posted : 29 days ago
    Started : 28 Feb, 2024 (1 month ago)

    Initial 2024 Scope of Work for Blaine HarborThis survey will include the facilities at the public pier at West end of Marine Drive, as well as the fixed wood deck portion of the shoreline promenade near Gates 1 & 2. The public pier and deck are supported by timber piling and were constructed in the 1990s.

    From: Port of Bellingham (Port)

  • Cape Porpoise Pier Bid - Notice to Contractors

    Type : Bid Notification

    Due : N/A
    Posted : 2 months ago
    Started : 30 Dec, 2023 (2 months ago)

    The North Floats and gangway are replaced. The South Floats and gangway are added. Site Improvements include new sewer service to the bait building and upgrades to electrical service, lighting, and communications; preparation for solar panels; replacement and relocation of fuel tanks; and parking area improvements.

    From: Kennebunkport (Town)