Search results for: gate rehab

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 83
  • BARKLEY LOCK EMERGENCY GATE REHAB

    Type : Bid Notification

    Due : 19 Jul, 2019 (about 4 years ago)
    Posted : about 5 years ago
    Started : 08 Aug, 2019 (about 4 years ago)

    Army Corps of Engineers (USACE), Nashville District, anticipates a requirement for a firm fixed-price construction contract for the rehabilitation of the existing emergency gate at Barkley Lock, Grand Rivers, KY. The estimated magnitude of this project is between $1,000,000 and $5,000,000.Summary of work for the Barkley Emergency Gate Rehab Project*:1. This work involves the rehabilitation of the existing emergency gate at Barkley Lock.

    From: Federal Government (Federal)

  • Red Rock Tainter and Sluice Gate Rehab

    Type : Award

    Due : 12 Oct, 2022 (18 months ago)
    Posted : 19 months ago
    Started : 27 Sep, 2022 (19 months ago)

    Contract Opportunity Award Details General Information Classification Description Attachments/Links Contact Information History Award Notices Follow Red Rock Tainter and Sluice Gate Rehab Active Contract Opportunity Notice ID W912EK22C0039 Related Notice W912EK22R0026 Contract Line Item Number W912EK22C0039 Department/Ind.

    From: Federal Government (Federal)

  • Multilevel Bulkhead Gate Rehab at William H Harsha Lake

    Type : Bid Notification

    Due : 28 Jan, 2022 (about 2 years ago)
    Posted : about 2 years ago
    Started : 20 Jan, 2022 (about 2 years ago)

    The Contractor shall furnish all necessary management, personnel, materials, supplies, tools, equipment, fuel, and vehicles, except as otherwise provided herein, required to remove five (5) gates from project, clean, test, repair as needed, paint, and deliver gates to project located at William H Harsha Lake in Clermont County, OH., as specified and in strict accordance with all Terms, Conditions, General, Specific and Technical Provisions, Drawings

    From: Federal Government (Federal)

  • Sources Sought - Jennings Randolph Lake Tainter Gate Rehab

    Type : Pre-Bid Notification

    Due : 14 Apr, 2023 (12 months ago)
    Posted : 13 months ago
    Started : 30 Mar, 2023 (13 months ago)

    Project Scope: The purpose of this project is to rehabilitate the five Tainter gates at Jennings Randolph Lake to ensure the safety, functionality, and reliability of the Tainter gate system. The proposed design includes structural, mechanical, and electrical rehabilitation work.

    From: Federal Government (Federal)

  • NASA SSC Miter Gate Rehab

    Type : Award

    Due : 29 Sep, 2021 (about 2 years ago)
    Posted : about 2 years ago
    Started : 25 Sep, 2021 (about 2 years ago)

    Work associated w ith this requirement includes the rehabilitation of both the upper and low er miter gates at the NASA SSC Canal Navigation  Lock. A miter gate consists of a left and right-hand leaf that are opposite hand but otherw ise identical. The Contractor shall remove and lay  flat each miter gate leaf on a deck barge for rehabilitation.

    From: Federal Government (Federal)

  • RS Kerr Tainter Gate Rehabilitation and Repairs (Gates 11 - 15), Sallisaw, Oklahoma

    Type : Bid Notification

    Due : 05 May, 2023 (12 months ago)
    Posted : 13 months ago
    Started : 01 May, 2023 (12 months ago)

    Please see the attached file (RFP_Specs_23R0021_A0001_RS Kerr Tainter Gate Rehab and Repair) for full details of this amendment. All other terms and condititions remain the same. ====== END OF AMENDMENT===== This is a competitive best value trade off solicitation for a construction contract for the project titled, RS Kerr Tainter Gate Rehab and Repair, located near Sallisaw, Oklahoma.

    From: Federal Government (Federal)

  • Y--GATE 318738 - Design Build - Rehab Wastewater

    Type : Bid Notification

    Due : 16 May, 2024 (in 12 days)
    Posted : 9 months ago
    Started : 08 Apr, 2024 (25 days ago)

    GATE 318738 - Design Build - Rehab Water, Wastewater, and Stormwater Utility Systems at Fort WadsworthThis is a two-phase design-build procurement per FAR 36.3. Phase 1 is complete and NPS is now starting Phase 2 of this solicitation via amendment 002. The successful pool of offerors from Phase 1 have been notified that they have been included in Phase 2. Please do not submit a proposal for phase 2 unless you have been directly notified by NPS.

    From: Federal Government (Federal)