Search results for: gear oils

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 13
  • <b>OIL</b> LUBRICATING ISO NO.150 EP INDUSTRIAL <b>GEAR</b> <b>OIL</b> 55-GAL DRUM<b>OIL</b> LUBRICATING ISO NO.150 EP INDUSTRIAL <b>GEAR</b> <b>OIL</b> 55-GAL DRUM

    OIL LUBRICATING ISO NO.150 EP INDUSTRIAL GEAR OIL 55-GAL DRUM

    Type : Contract

    Due : 29 Mar, 2024 (Today)
    Posted : 27 days ago
    Started : 29 Feb, 2024 (28 days ago)

    OIL LUBRICATING ISO NO.150 EP INDUSTRIAL GEAR OIL 55-GAL DRUM Solicitation ID/Procurement Identifier: 2031ZA24P00236 Ultimate Completion Date: Fri Mar 29 17:00:00 GMT 2024

    From: Federal Procurement Data System (Federal)

  • B610 Fabric Doors

    Type : Bid Notification

    Due : 02 Apr, 2024 (in 4 days)
    Posted : 3 days ago
    Started : 25 Mar, 2024 (3 days ago)

    . - Replace gear box oil and appropriate seals. Used oil shall be disposed of in accordance with DoD and local standards. - Inspect, test and replace safety and limit devices as needed.

    From: Federal Government (Federal)

  • T11-075 Differential Repair

    T11-075 Differential Repair

    Type : Contract

    Due : 01 Apr, 2024 (in 2 days)
    Posted : 2 days ago
    Started : 26 Mar, 2024 (3 days ago)

    \nDifferential was filled with syn. 80-140 gear oil. The threads for the air fitting were tapped due to\nbad threads. The truck was road tested in the yard, then taken out on the road for a second road\ntest. Differential fluid level was checked and ok, no leaks were observed. the differential was\nremoved showing the differential carrier was shattered.\n\n2.

    From: Maine (State)

  • Demonstration Farm-SU Ag Center Mandatory PreBid Conf&Site Visit, 5% Security Bond, Perform&Pymt Bond

    Type : Bid Notification

    Due : 25 Apr, 2024 (in 27 days)
    Posted : 11 days ago
    Started : 13 Mar, 2024 (15 days ago)

    Also note when clearance can no longer be taken up, as we can no longer lower the gear, gear rock cannot be eliminated, and replacement is inevitable. (Worms and gears are not shelf items and require 3 to 6 months lead time). Clean, flush, and replace worm gear oil every 1-1/2 years, examine oil wiper between drive sheave and gear inside the machine to reduce oil seepage to drive sheave.

    From: Louisiana (State)

  • Furnish Maintenance and Repair of Vertical Transportation Systems Mandatory Pre-Bid Conf 4/9/2024 / LA Contractor License Required

    Type : Bid Notification

    Due : 24 Apr, 2024 (in 26 days)
    Posted : 2 days ago
    Started : 25 Mar, 2024 (3 days ago)

    Also note when clearance can no longer be taken up, as we can no longer lower the gear, gear rock cannot be eliminated, and replacement is inevitable. (Worms and gears are not shelf items and require 3 to 6 months lead time). Clean, flush, and replace worm gear oil every 1-1/2 years, examine oil wiper between drive sheave and gear inside the machine to reduce oil seepage to drive sheave.

    From: Louisiana (State)

  • Motor Oils, Fluids, and Lubricants

    Type : Bid Notification

    Due : 27 Mar, 2024 (1 day ago)
    Posted : 1 month ago
    Started : 21 Feb, 2024 (1 month ago)

    , Aviation Engine [405-45]Oil, Chain Saw [405-47]Oil, Compressor [405-48]Oil, Cutting [405-49]Oil, Gear [405-50]Oil, Heat Transfer Fluid, Fire-Resistant [405-51]Oil and Fluid, Hydraulic [405-52]Oil, Instrument [405-54]Oil, Lubricating: Household, General Purpose, etc. [405-57]Oil, Lubricating: Differential and Gear Lubricant [405-60]Oil, Marine Engine [405-63]Oil, Outboard Motor [405-66]Oil, Penetrating, Special Use (May Contain Graphite) [405-69]

    From: Osceola County School Board (School)

  • HVAC Preventive Maintenance

    Type : Bid Notification

    Due : 15 Apr, 2024 (in 17 days)
    Posted : 11 days ago
    Started : 15 Mar, 2024 (13 days ago)

    INVITATION TO BID NO. 40003-10566 Furnish HVAC PREVENTIVE MAINTENANCE ISSUING AGENCY: Bossier Parish Community College Purchasing Department (Bldg J) 6220 East Texas Street Bossier City, LA 71111 PURCHASING DIRECTOR: Gayle Doucet gdoucet@bpcc.edu Ph: (318) 678-6117 ITB RELEASE DATE: March 15, 2024 PRE-BID CONFERENCE: Tuesday, April 2, 2024 CONFERENCE/INSPECTION TIME: 10:00 a.m., Central Time PRE-BID CONFERENCE LOCATION: Bossier Parish Community College Bldg. J – Maintenance Department 6220 East Texas Street Bossier City, LA 71111 Failure to be represented at the mandatory pre-bid conference/on-site inspection tour shall cause rejection of the bid without further consideration. DEADLINE F...

    From: Louisiana (State)