Type : Bid Notification
Contractor will be required to review, evaluate, and analyze geotechnical engineering parameters; develop engineering documents; prepare geotechnical engineering reports related to facilities owned or under the responsibility of DWR, including State Water Project (SWP) facilities. Estimated Contract Value: $40,000,000 - $50,000,000