Search results for: grade topsoil

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 228
  • Demolish Greenhouse 9A/Site Grade Topsoil

    Type : Award

    Due : 02 Mar, 2023 (14 months ago)
    Posted : 15 months ago
    Started : 15 Feb, 2023 (14 months ago)

    Contract Opportunity Award Details General Information Classification Description Attachments/Links Contact Information History Award Notices Follow Demolish Greenhouse 9A/Site Grade Topsoil Active Contract Opportunity Notice ID 12405B23Q0068 Related Notice 12405B23Q0068 Contract Line Item Number Department/Ind.

    From: Federal Government (Federal)

  • Little Lake Pond Remediation & Cleanout

    Type : Bid Notification

    Due : 07 May, 2024 (in 8 days)
    Posted : 12 days ago
    Started : 01 Apr, 2024 (27 days ago)

    This pond is a small dry pond located in Little Lake Park, the following is a general description of the Work to be completed under the Contract:.01 Initial site work including sediment and erosion controls;.02 All works required to complete remediation works and sediment removals.03 Remove and replace fencing and gates.04 Remove and replace existing culvert.05 Fine grade, topsoil, sod, and seed as required;.06 Clean-up and Demobilization .07 Bid

    From: Midland (Town)

  • Demolition of House in Gray

    Type : Bid Notification

    Due : 23 Apr, 2024 (5 days ago)
    Posted : 17 days ago
    Started : 27 Mar, 2024 (1 month ago)

    Fill will be brought within 6 inches of existing grade 5. Suitable topsoil will be used to bring the site to existing grade. Demolition MUST be completed no later than July 15, 2024 Should any questions arise regarding these specifications, you may contact Phillip Patrick at (423) 753-1129 or at patrickp@wcde.org.

    From: Washington County Schools (School)

  • Scott Township - Parks Improvement Project

    Type : Bid Notification

    Due : 13 Apr, 2022 (about 2 years ago)
    Posted : about 2 years ago
    Started : 18 Mar, 2022 (about 2 years ago)

    Work includes but is not limited to paving, crushed stone paths, formalizing stone parking areas, achieving ADA compliant grades, topsoil and seed, installation of benches and signs, a gaga pit, and fencing. Coordination with certified playground installers and court coating installer will be required. Contact Information

    From: Pennsylvania (State)

  • Community Centre Backyard Project - Phase 1 - 2023 Civil Site Works

    Type : Bid Notification

    Due : 05 Oct, 2023 (6 months ago)
    Posted : 7 months ago
    Started : 19 Sep, 2023 (7 months ago)

    250mm of topsoil from the onsite topsoil stockpiles over the two (2) soccer pitch areas.Cut/shape and compact perimeter swales around the two (2) soccer pitches.Supply and install storm catchbasin manholes connected to the Big ‘O’ trench drains (headers) where noted along the perimeter swales.Move, place, spread and grade 150mm of topsoil from the onsite topsoil stockpiles over the perimeter swales.Supply and install black chain-link fencing of varying

    From: Petrolia (Town)

  • Tank Street Reconstruction Project

    Type : Bid Notification

    Due : 12 Mar, 2024 (1 month ago)
    Posted : 2 months ago
    Started : 04 Feb, 2024 (2 months ago)

    stripped topsoil over disturbed ditch, swale and boulevard areas.Transport, screen and spread topsoil from Community Recreation Centre (YMCA) site stockpile over disturbed ditch, swale and boulevard areas.Supply and place hydroseed over all discussed ditch, swale and boulevard areas.Supply and install bio-degradable single-net straw matting on 2:1 east roadside ditch slopes or as/where directed by the Engineer for erosion protection.To obtain documents

    From: Petrolia (Town)

  • Brake Lathe

    Type : Bid Notification

    Due : 02 May, 2024 (in 4 days)
    Posted : 9 days ago
    Started : 03 Apr, 2024 (25 days ago)

    Borrow soils used for the purposes other than for structural fill, such as finish grade, topsoil or surcharge, are required to be tested in the same manner for environmental contaminates. Contractor will inform District of the location of borrow soil no less than two weeks prior to its use on District property. Testing will include the collection of not less than three samples per borrow site.

    From: Omaha Public Schools (School)