Search results for: ground level water

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 156
  • Ground Level Water Intrusion Repairs at Durham County Judicial Building Annex

    Type : Bid Notification

    Due : 18 Aug, 2022 (20 months ago)
    Posted : 21 months ago
    Started : 15 Jul, 2022 (21 months ago)

    ADVERTISEMENT FOR BIDS Ground Level Water Intrusion Repairs at Durham County Judicial Building Annex IFB No. 23-001 Bids will be received by the County of Durham Purchasing Division of Finance, Durham County Administration Building II, 201 East Main Street, 7th Floor, Room #703, Durham, North Carolina 27701, until 2:00 P.M., Eastern Time, on August 18, 2022.

    From: Durham County (County)

  • Barksdale AFB - Cathodic Protection Survey Service

    Type : Award

    Due : 27 Sep, 2023 (7 months ago)
    Posted : 7 months ago
    Started : 13 Sep, 2023 (7 months ago)

    Work shall consist offurnishing all labor, tools, equipment, materials, and transportation necessary to perform a water tank calibration survey of thecathodic protection (CP) systems in five elevated water tanks and six ground level water tanks located on Barksdale AFB, LA.All tanks are in service and have sufficient water for the operation of the CP systems. Surveys shall be performed IAW MILHDBK-1136, NACE standards.

    From: Federal Government (Federal)

  • REPLACE ROOF- WATER TANK

    Type : Bid Notification

    Due : 11 Mar, 2020 (about 4 years ago)
    Posted : about 4 years ago
    Started : 09 Mar, 2020 (about 4 years ago)

    Thepurpose of the project is to replace approximately 12,000 sq ft of existing roof of a ground level water tank.See the Specification attachment included with the solicitation posting for the complete requirements of the work.The performance period for the project will be 64 calendar days from issuance of the notice to proceed.Pursuant to Federal Acquisition Regulation 36.204, the estimated magnitude of the project lies between$25,000 and $100,000

    From: Federal Government (Federal)

  • Wildhawk Water Treatment Plant Recoating Project Phase 1

    Type : Bid Notification

    Due : 14 Jul, 2022 (22 months ago)
    Posted : 23 months ago
    Started : 13 Jun, 2022 (23 months ago)

    SummaryIn general, the work to be performed under this contract includes the furnishing of all labor, materials, and equipment for repairing one 1.5 MG ground level steel water storage tank’s internal roof support structure (if so directed - pending blast inspection); and for the interior and exterior recoating of the 1.5 MG treated water storage tank no. 1, 0.165 MG backwash tank no. 1; and other related facilities at a water treatment plant.

    From: Sacramento (County)

  • MEVE PAINT WETHERILL MESA TANK

    Type : Bid Notification

    Due : 14 Sep, 2018 (about 5 years ago)
    Posted : about 5 years ago
    Started : 31 Jul, 2018 (about 5 years ago)

    RUBBER GASKETS AROUND ACCESS HATCHES WILL BE REPLACED AND A NEW WATER LEVEL INDICATOR INSTALLED. b.

    From: Federal Government (Federal)

  • Big Bend Left Abutment Repair

    Type : Bid Notification

    Due : 03 Mar, 2022 (about 2 years ago)
    Posted : about 2 years ago
    Started : 23 Feb, 2022 (about 2 years ago)

    The contractor must provide all personnel, equipment, tools, vehicles, supervision, and other items necessary to including but not limited to design, install, and operate dewatering system to lower ground water level in the work area; remove and replace the existing collector pipe system (toe drain, toe drain outfall connector pipe, relief well collector pipe, and outfalls for relief wells) located near the downstream toe of the dam; abandon six (

    From: Federal Government (Federal)

  • Construction of Water Production Facility for Cresson MUD No. 1

    Type : Bid Notification

    Due : 22 May, 2024 (in 17 days)
    Posted : 23 days ago
    Started : 27 Mar, 2024 (1 month ago)

    The Phase 1 Water Production Facility submittal will include detailed construction plans and technical specifications for the following facilities: A new 300,000-gallon welded steel ground storage tank with an altitude valve, with water level sensors, level controls and monitors, Alternatively, a 600,000-gallon prestressed concrete ground storage tank A new high service pump station with a capacity of 2,280 gallons per min (3.2 MGD) with variable

    From: Pape-Dawson Engineers (Co-op)