Type : Bid Notification
the specifications issued for the solicitation of bids titled "Galvanized Steel Beam Guide Rail 2024-2026" (4-BUCCP-24020).
the specifications issued for the solicitation of bids titled "Galvanized Steel Beam Guide Rail 2024-2026" (4-BUCCP-24020).
Supply and installation of steel beam guide rail roadside protection systems Bid Document Access : - Bid document preview, bid opportunity, and award notices are available on the site free of charge. Suppliers are not required to register for a bid opportunity prior to previewing unsecured bid documents. Please note, some documents may be secured and you will be required to register for the bid to download and view the documents.
The County of Middlesex is soliciting Tenders for supply of products, materials and equipment for and the installation of steel beam guide rail type M20 and energy attenuating end treatments to be completed in the locations described within the Tender documents.
This construction project generally involves the removal of an existing corrugated steel pipe (CSP) culvert crossing under Lacasse Road and replacement with a new polymerized CSP culvert. The roadway platform is to be widened and new steel beam guide rail and energy-absorbing terminals are to be installed at the culvert and nearby approach roadway.
, plan and materials necessary to carry out the following work: a) replacement of granular road base, granular road surface and asphalt road pavement; b) supply and install 2-1500mm diameter and 1-1800mm diameter polymer coated corrugated steel pipe culverts; c) temporary remove and reinstate new guide rail system; and, d) all work as shown on the Contract Drawings and described hereinafter or as may otherwise be directed by the Engineer for the tender
binwall cribbing, concrete footing, precast slab girders, cast-in-place concrete deck and curbs, and open metal traffic barriers.Remove existing asphalt on approaches and place new hot mix asphalt.Reconstruction of approaches.Grading.Steel beam guide rail and end treatments on approaches.More detailed requirements are set out in Part 5, Specifications Schedule.
Project Description : Contact Information :-