Search results for: hall basement air

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 7 of 7
  • Mackenzie Hall Basement Air Handling Project

    Type : Bid Notification

    Due : 08 Dec, 2022 (16 months ago)
    Posted : 17 months ago
    Started : 23 Nov, 2022 (17 months ago)

    Mackenzie Hall Basement Air Handling Project Project Description :Replacement and upgrade of the air handler components and associated equipment in the basement of Mackenzie Hall. Mackenzie Hall is a fully occupied student residence that is fully occupied annually from September through April and partially occupied May through August.

    From: MerX (Federal)

  • Clark, Barton, and Lundgren Halls Heating Piping

    Type : Bid Notification

    Due : 12 Jun, 2023 (10 months ago)
    Posted : 11 months ago
    Started : 22 May, 2023 (11 months ago)

    Currently, Clark Hall has central air conditioning from the basement to the second floor with window air conditioning units above the second floor. Barton and Lundgren Halls have no air conditioning. This project will add a/c to the two residence halls and the third and fourth floors of the office building. An extensive Feasibility Study was performed by Grumman Butkus.

    From: Illinois Public Higher Education (Higher Education)

  • Project DescriptionA Professional Service Consultant, PSC, will be selected for this project. The University shall negotiate a Professional Services Agreement, ...

    Type : Award

    Due : 12 Jun, 2023 (10 months ago)
    Posted : 11 months ago
    Started : 22 May, 2023 (11 months ago)

    Currently, Clark Hall has central air conditioning from the basement to the second floor with window air conditioning units above the second floor. Barton and Lundgren Halls have no air conditioning. This project will add a/c to the two residence halls and the third and fourth floors of the office building. An extensive Feasibility Study was performed by Grumman Butkus.

    From: Illinois Public Higher Education (Higher Education)

  • 2024/25 through 2028/29 Preliminary Five-Year Plan

    Type : Bid Notification

    Due : 29 Jun, 2023 (10 months ago)
    Posted : 9 months ago
    Started : 14 Jun, 2023 (10 months ago)

    Window and Observatory Roof N/A IA DM PWC 4,800 Replacement Maloney Field Site Renewal N/A IA DM PWC 1,304 Library Annex 1 & 2 Gas Furnace Replacement N/A IA DM PWC 260 Campuswide Road and Sidewalk Renewal N/A IA DM PWC 600 Administration Basement Renewal N/A IA DM PWC 1,600 Burk Hall Replace 6 Air Handler Units and N/A IA DM PWC 1,900 Exterior Doors Replacement Old Science Building Copper Roof Replacement N/A IA DM PWC 375 Fine Arts Replace 11 Air

    From: California State University (Higher Education)