Search results for: halon fire suppression system

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 81
  • Replace Halon Fire Suppression System

    Type : Bid Notification

    Due : 26 Sep, 2022 (19 months ago)
    Posted : 20 months ago
    Started : 19 Sep, 2022 (19 months ago)

    This project consists of furnishing all equipment, materials and labor for the replacement of a Halon fire suppression system with Novec 1230 fire suppression system.This project will consist of the following:     1) Remove and dispose of existing halon fire suppression system     2) Reuse current components such as piping (where possible)     3) Install new components and Novec 1230     4) Repair and restore all finishes impacted by the removal and

    From: Federal Government (Federal)

  • MTA-NYCT As Needed Inspection Maintenance and Repair of Halon Fire Suppression System

    Type : Bid Notification

    Due : 08 Jun, 2022 (22 months ago)
    Posted : about 2 years ago
    Started : 31 Jan, 2022 (about 2 years ago)

    MTA-NYCT As Needed Inspection Maintenance and Repair of Halon Fire Suppression System Solicitation Number: (INQ) (376519) Due Date: 6/08/2022 @ 3 PM Contact Manager: J. Ross

    From: New York City Metropolitan Transportation Authority (Transportation)

  • Halon Fire Suppression System Panel and Device Replacement Services; IFB #20C301003 Golden Gate Division Office

    Type : Bid Notification

    Due : 15 Dec, 2020 (about 3 years ago)
    Posted : about 3 years ago
    Started : 30 Oct, 2020 (about 3 years ago)

    The Department of California Highway Patrol (CHP) invites prospective bidders to review and respond to the attached Invitation for Bids (IFB) #20C301003 entitled, ¿CHP Golden Gate Division Office ¿ Halon Fire Suppression System Panel and Device Replacement Services.  When preparing and submitting a bid, compliance with the instructions found within the IFB Document is imperative.

    From: California (State)

  • REPLACE FIRE SUPPRESSION SYSTEMS AT FCI SHERIDAN CONTROL CENTER

    Type : Bid Notification

    Due : 12 May, 2022 (23 months ago)
    Posted : about 2 years ago
    Started : 11 Apr, 2022 (about 2 years ago)

    This project consists of furnishing all equipment, materials and labor for the replacement of a Halon fire suppression system with Novec 1230 fire suppression system.This project will consist of the following:     1) Remove and dispose of existing halon fire suppression system     2) Reuse current components such as piping (where possible)     3) Install new components and Novec 1230     4) Repair and restore all finishes impacted by the removal and

    From: Federal Government (Federal)

  • Expression of Interest to Design and Engineer Halon Fire Suppression Systems with FK-5-1-12 Clean Agent Fire Suppression

    Type : Bid Notification

    Due : 14 Feb, 2020 (about 4 years ago)
    Posted : about 4 years ago
    Started : 05 Feb, 2020 (about 4 years ago)

    PurposeThe purpose of this inquiry is to determine your interest and qualifications as a possible Offeror to design and engineer Halon fire suppression systems with FK-5-1-12 clean agent fire suppression systems. It is anticipated the Procurement Statement of Work will request subcontractor(s) to design the system for use in multiple facilities located at the Department of Energy Savannah River Site.

    From: Federal Government (Federal)

  • 2300000209 RFB-116-23 - KET-Next Gen Conv - FACILITY UPGRADE

    Type : Bid Notification

    Due : 02 Nov, 2022 (18 months ago)
    Posted : 18 months ago
    Started : 03 Oct, 2022 (19 months ago)

    These upgrades include replacement of the building copper and fiber data cabling; replacement of an Owner-Furnished chiller; replacement of an Owner-Furnished rooftop air-handler; replacement of an existing Halon fire suppression system with new chemical suppression; replacement of an Owner-Furnished central UPS system; and architectural revisions in select spaces.

    From: State of Kentucky (State)

  • Halon Fire Supression System-Barge 727-Mississippi River Project Office

    Type : Bid Notification

    Due : 27 Feb, 2018 (about 6 years ago)
    Posted : about 6 years ago
    Started : 06 Feb, 2018 (about 6 years ago)

    Removal of existing Halon fire suppression system and Design, Install, and test a suitable replacement Compressed CO2 system.GENERAL1) The specification details the requirements for an engineered high pressure carbon dioxide (CO2) fire suppression system. These requirements must be followed in order to produce a safe and effective fire protection and suppression system.2) All materials and equipment shall be new and unused.

    From: Federal Government (Federal)