Install Stair Hand Rails at NASK, Kingsville Texas, DLA B5722 Bulk Fuels Tanks numbers 101/102/103.
NUMBER: 28012 PURCHASING AGENCY: Natural Resources Department SOLICITATION NUMBER: 2000009738 Solicitation Event Version:1 TITLE: Fishing Pier Sections w/ ADA Hand Rail RESPONSE TO THIS SOLICITATION IS DUE NO LATER THAN5/23/2019 AT2:00 PM Central Time SHIP TO INFORMATION:SEE BELOW SEE BELOW This Solicitation Event is being conducted in the SWIFT system. Log in to the Supplier Portalto view this event.
CLIN 1: FORWARD HAND RAIL BASE WELDING REPAIRS QTY: 1 JB E-MAIL QUOTES TO SK1 Nancy Owens NANCY.A.OWENS@USCG.MIL THIS PURCHASE WILL BE BASED ON THE FOLLOWING CRITERIA: LOWEST COST TECHNICALLY ACCEPTABLE VENDORS DOING BUSINESS WITH THE COAST GUARD MUST BE REGISTERED OR BE WILLING TO REGISTER WITH SYSTEM FOR AWARD MANAGEMENT AT WWW.SAM.GOV.
Contractor shall provide all materials, labor, and supervision necessary to install a safety railing for an intake structure roof at Paint Creek Lake, Bainbridge, OH, in accordance with the attached scope of work. Contact Information: Joshua Westgate, Phone 3043995050, Email joshua.k.westgate@usace.army.mil Office Address :Attn: CELRH-CT502 8th Street Huntington WV 25701-2070 Location: USACE District, Huntington Set Aside: Total Small Business
RAIL POST 2X12 #2 GROUND CONTACT HEADER 2X12 #2 GROUND CONTACT 3' SCAB EXISTING PILLING 12' +/- O.C. 2X12 #2 GROUND CONTACT HEADER 5 8" GALVANIZED CARRIAGE BOLTS 2x12 #2 GROUND CONTACT STRINGERS 16" O.C. 5 8" GALVANIZED CARRIAGE BOLTS 8'-0" O.C. 2X12 #2 GROUND CONTACT PURLIN FOR HANDRAIL STRENGTH 2X6 #1 GROUND CONTACT DECKING 6X6 #2 GROUND CONTACT HAND RAIL POST PILE EMBEDMENT TO SUIT SOIL- CONDITIONS CONSIDERING CURRENTS,SCOUR, WIND, WAVES, AND
Contract Opportunity General Information Classification Description Attachments/Links Contact Information History Award Notices Follow 16--HAND RAIL ASSEMBLY Active Contract Opportunity Notice ID N0038322QB263 Related Notice Department/Ind.
Hand Rails at Kiptopeke State Park Micro Business Set-Aside Award Priority QQ : EVA001_QQ228073 Summary Close A199DCR Department of Conservation and Recreation Chris Cole Construction Issued On : 09/25/2018 09:57 AM Closing On : 10/16/2018 02:00 PM issued Time Left: 19 Days
Remove main deck hand rail stanchions base hinges. Blast and preserve all exterior surfaces of the vessel. Shift the vessel on the blocks to achieve 100 percent preservation of underwater hull. Remove existing and install new zinc anodes. Hull and main deck require ultrasonic measurement of plating thickness and repair of areas below minimum thickness.
Title: Hand Rails at Foltz Gym @ School For The Deaf Number: EVT0006643 Due Date: 6/12/2019 Agency: School for the Deaf