Search results for: hangar structure

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 131
  • New Police Heliport Hangar Structure & Adjacent Civil Work

    Type : Bid Notification

    Due : 02 Dec, 2021 (about 2 years ago)
    Posted : about 2 years ago
    Started : 19 Oct, 2021 (about 2 years ago)

    Project Title New Police Heliport Hangar Structure & Adjacent Civil Work Invitation # Police Bid Posting Date 10/19/2021 1:24 PM (PDT) Project Stage Bidding Bid Due Date 12/02/2021 2:00 PM (PDT) Response Format Electronic Project Type Bid Response Types Line Items SEE BIDDERS CHECKLIST (required) Type of Award Lump Sum Categories 28000 - Electrical Cables And Wires

    From: Pasadena (City)

  • LF-60 RENOVATE HANGAR FOR HSC-26 AND REPAIR CANTILEVER HANGAR STRUCTURE

    Type : Award

    Due : 27 Sep, 2023 (7 months ago)
    Posted : 7 months ago
    Started : 14 Sep, 2023 (7 months ago)

    LF-60 Renovate Hangar for HSC-26 and Repair CAtilever Hangar Structure, Naval Station Norfolk, Norfolk, Virginia

    From: Federal Government (Federal)

  • LF-60 Renovation of Hangar for HSC-26 & Repair of Cantilever Hangar Structure at Naval Station Norfolk, Norfolk, Virginia

    Type : Bid Notification

    Due : 21 Jun, 2023 (10 months ago)
    Posted : 11 months ago
    Started : 23 May, 2023 (11 months ago)

    Hangar (approx. 18,700 SF) must be remediated of lead paint and provided new bi-directional crane. Modify support areas (approx. 11,200 SF First Floor and 8,500 SF Second Floor) to suit Activity program. Project to include temporary shoring of the hangar cantilevers while threaded rod connections are repaired.

    From: Federal Government (Federal)

  • Construction - USMS JPATS Hangar Modification, Will Rogers World Airport (WRWA) Oklahoma City, Oklahoma

    Type : Bid Notification

    Due : 16 Feb, 2023 (14 months ago)
    Posted : 15 months ago
    Started : 03 Feb, 2023 (15 months ago)

    No facsimile responses will be honored.Objective: The primary objective of this Project is to modify JPATS existing hangar structure and install a tail door in each hangar bay with sufficient vertical and horizontal clearance to fully enclose a Boeing 737-800 aircraft.

    From: Federal Government (Federal)

  • Y--FY18 MCON P-601, AIRCRAFT MAINTENANCE HANGAR 2, JOINT REGION MARIANAS, ANDERSEN AFB, GUAM

    Type : Bid Notification

    Due : 08 Aug, 2017 (about 6 years ago)
    Posted : about 6 years ago
    Started : 15 Jun, 2017 (about 6 years ago)

    The hangar structure will have a conventional shallow foundation with concrete walls and structural steel columns supporting a concrete roof on structural steel beams/trusses. Facilities will be constructed with features to meet Guams severe wind, seismic, and corrosive environmental conditions. Further, this project will procure furniture, fixtures and equipment.Estimated range is from $50,000,000 to $100,000,000.

    From: Federal Government (Federal)

  • Aviation Fall Arrest/Protection System & Equipment

    Type : Bid Notification

    Due : 14 Jun, 2020 (about 3 years ago)
    Posted : about 4 years ago
    Started : 05 Jun, 2020 (about 3 years ago)

    The purpose of the Engineering Report is to analyze the loading on and reinforcement of the existing hangar structure in all four hangars in way of the proposed new Fall Arrest System.  The design of the Fall Arrest System will vary for each hangar as each are unique.  The design of the Fall Arrest System should not significantly disrupt or modify existing hangar features required for normal operations. 

    From: Federal Government (Federal)

  • Y--FY18 MCON P-250 MALS FACILITIES AND P-260 CORROSION CONTROL HANGAR, U.S. NAVSUPACT ANDERSEN GUAM, JOINT REGION MARIANAS, GUAM

    Type : Pre-Bid Notification

    Due : 17 Oct, 2017 (about 6 years ago)
    Posted : about 6 years ago
    Started : 11 Oct, 2017 (about 6 years ago)

    Hangar will include support spaces for paint mixing, paint storage, gear and equipment storage, electrical, mechanical and communications rooms, change rooms, shower facilities, and administrative offices.The hangar structure will be sized to accommodate MV-22 and CH-53K aircraft. The corrosion control bay will be provided with a pre-manufactured aircraft blast and a paint booth each sized to accommodate H-1 and H-60 aircraft.

    From: Federal Government (Federal)