Search results for: hardware for beam size

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 14
  • Hardware for Beam Size Monitor Beamline

    Type : Bid Notification

    Due : 15 Aug, 2022 (20 months ago)
    Posted : 21 months ago
    Started : 29 Jul, 2022 (21 months ago)

    Argonne National Laboratory (ANL) is initiating upgrades for the Advanced Photon Source-Upgrade (APS-U) project, including one beam size monitor (BSM) beamline using the A:M1 source for optimal emittance measurements. The beamline has two relative beam size monitors (RBSM) for fast emittance/energy-spread measurements, one for the horizontal plane and the other for the vertical plane.

    From: Federal Government (Federal)

  • HARDWARE

    Type : Contract

    Due : 28 Jan, 2026 (in 21 months)
    Posted : about 3 years ago
    Started : 29 Jan, 2021 (about 3 years ago)

    HARDWARE Solicitation ID/Procurement Identifier: 47QTCA18D00AZ Ultimate Completion Date: Wed Jan 28 18:00:00 GMT 2026

    From: Federal Procurement Data System (Federal)

  • I Beam Hardware Kits

    Type : Bid Notification

    Due : 15 Aug, 2023 (8 months ago)
    Posted : 8 months ago
    Started : 31 Jul, 2023 (9 months ago)

    I Beam Hardware Kits Scott 0000317767 08/15/2023

    From: Indiana Department of Transportation (Transportation)

  • Spectral Channels Splicer (SCS) for Low SWaP Spectral Beam Combining Laser Systems

    Type : Bid Notification

    Due : 15 Apr, 2022 (about 2 years ago)
    Posted : about 2 years ago
    Started : 15 Mar, 2022 (about 2 years ago)

    Each input channel spectrum is angularly dispersed to replace many adjacent narrow band emitters, lessening the laser hardware needed. Transmission system design minimizes optical path length and beam size since materials absorb less and are 4x more tolerant to surface distortions than mirrors.

    From: Federal Government (Federal)

  • Hardware

    Type : Award

    Due : 30 May, 2023 (11 months ago)
    Posted : 11 months ago
    Started : 18 May, 2023 (11 months ago)

    This was a small business set-aside and was awarded as fixed-price.

    From: Federal Government (Federal)

  • HARDWARE

    Type : Contract

    Due : 03 Jul, 2023 (10 months ago)
    Posted : 14 months ago
    Started : 15 Feb, 2023 (14 months ago)

    HARDWARE Solicitation ID/Procurement Identifier: HHSN316201500029W Ultimate Completion Date: Mon Jul 03 17:00:00 GMT 2023

    From: Federal Procurement Data System (Federal)

  • IARPA RAVEN Services

    Type : Bid Notification

    Due : 15 Apr, 2020 (about 4 years ago)
    Posted : about 4 years ago
    Started : 10 Apr, 2020 (about 4 years ago)

    spot sizes across the entire voltage and current operating ranges of the instrument.Determine and report the minimal beam spot size achieved with the hardware installed in the NIST labs for SEM current settings of 100 pA, 1 nA, and 10 nA at SEM voltage settings of 15keV, 20 keV, and 25 keV.Demonstration and knowledge transfer on how to bake the nanospace chamberReplace and repair the ion pump controllerDemonstrate successful operation of the ion

    From: Federal Government (Federal)