Search results for: hazardous materials pad drain

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 221
  • Repair Hazardous Materials Pad Drain to OWS-22

    Type : Bid Notification

    Due : 08 Feb, 2023 (15 months ago)
    Posted : 15 months ago
    Started : 01 Feb, 2023 (15 months ago)

    See attached documents for scope of work and any applicable drawings.Amendment 0001

    From: Federal Government (Federal)

  • 7J20--PIV Fingerprint Readers for VISN 22

    Type : Bid Notification

    Due : 08 Aug, 2022 (21 months ago)
    Posted : 21 months ago
    Started : 01 Aug, 2022 (21 months ago)

    Must have a presentation attack detection (PAD) to be able to determine fingerprint is valid. e. Must have at least USB 2.0 high speed interface. f. Must be able to operate with system Windows 7/8.1/10 g. Must have illuminated pictograms on device display. h. Able to capture the fingerprint with both flat and rolls. i. Must be light weight and ergonomically design of a minimum of (3) three lbs. maximum of (5) five lbs. j.

    From: Federal Government (Federal)

  • Furnishing of labor, material, and equipment for the Southwest Elementary School Boiler Replacement

    Type : Bid Notification

    Due : 12 Jul, 2022 (22 months ago)
    Posted : 22 months ago
    Started : 28 Jun, 2022 (22 months ago)

    HAZARDOUS MATERIALS WARNING: IF UNCOVERED MATERIALS ARE SUSPECTED OF CONTAINING ASBESTOS, LEAD-BASED PAINT, PCB'S OR ANY OTHER HAZARDOUS MATERIAL, STOP WORK IN THAT AREA AND REPORT THE CONCERN TO THE CONSTRUCTION MANAGER, OWNER AND ENGINEER IMMEDIATELY. 18. FURNISH AND INSTALL ALL INCIDENTAL ACCESSORIES REQUIRED TO MAKE THE MECHANICAL WORK COMPLETE AND OPERATIONAL. 19.

    From: Durham Public Schools (School)

  • Landfill Leachate PFAS Wastewater Management - DPW

    Type : Bid Notification

    Due : 30 May, 2024 (in 24 days)
    Posted : 29 days ago
    Started : 22 Mar, 2024 (1 month ago)

    Given the potential for PFAS to be a classified by the USEPA as a hazardous material, provide an explanation as to how this change in classification would affect the proposed methodology or supporting services, particularly associated with the transport of concentrated liquids or other waste and the associated impact on long-term O&M costs.

    From: Kent County Administration (County)

  • Notice of Application for State Water Quality Certification - Sawmill Cove

    Type : Bid Notification

    Due : 25 Apr, 2024 (9 days ago)
    Posted : 1 month ago
    Started : 04 Apr, 2024 (1 month ago)

    Avoidance: - Spill containment equipment and materials will be readily available should any releases occur. All hazardous materials and debris will be stored above the high tide line (HTL) and secured to prevent being blown offshore. All chemicals and petroleum products will be properly stored to prevent spills. Petroleum products, cement, chemicals, or other deleterious materials will not be allowed to enter surface waters.

    From: Alaska (State)

  • Counter-Biometrics Services

    Type : Bid Notification

    Due : 18 Feb, 2020 (about 4 years ago)
    Posted : about 4 years ago
    Started : 14 Jan, 2020 (about 4 years ago)

    Proprietary information, if any, must be clearly marked on all material(s) submitted. All information received marked Proprietary will be handled in accordance with 41 USC 2101- 2107. Responding to this RFI is completely voluntary and will not enhance or adversely affect responses to any resulting solicitation if such solicitation is issued at a later date. There is no competitive advantage gained by responding to this RFI.

    From: Federal Government (Federal)

  • SOURCES SOUGHT - DESIGN BUILD HARB B208

    Type : Bid Notification

    Due : 30 Apr, 2024 (4 days ago)
    Posted : 12 days ago
    Started : 22 Apr, 2024 (12 days ago)

    This project will comply with Unified Facilities Codes (UFCs) 1-200-01, 1-200-02, 4-010-01, 3-580, 3-550-01, 3-600-01, and 520-01; Air Force Instructions (AFIs) 32-1062, 32-1063, 32-1065, and other applicable UFCs, installation architectural standards, and local building codes.Anticipated Construction Phase will include the following activities: B208: Testing suspected surfaces for hazardous materials before demolition or paint preparation (sanding

    From: Federal Government (Federal)