Type : Bid Notification
The purpose of this RFQ is to hire a qualified Contractor for the supply and installation of a primary and secondary fiber pathway from Well No. 7 to Heat Exchange Building to control operation of Well No. 7.
The purpose of this RFQ is to hire a qualified Contractor for the supply and installation of a primary and secondary fiber pathway from Well No. 7 to Heat Exchange Building to control operation of Well No. 7.
Oregon Institute of Technology (Oregon Tech) is seeking proposals from firms interested in providing Construction Manager/General Contractor (CM/GC) services to Oregon Tech by submitting a response to this Request for Proposals (RFP) for the Heat Exchange (HX) Building/Geothermal Systems Renovation at the Klamath Falls, OR Campus.
NON-STANDARD WORK ORDER FOR REPAIR OF VACUUM HEAT EXCHANGE IN BUILDING 5272 ROOM G2C25 Solicitation ID/Procurement Identifier: HHSF223201610009C Ultimate Completion Date: Wed Sep 30 17:00:00 GMT 2020
REPLACE HEAT EXCHANGE CONTROLLER AT THE WILLIAM S. MOORHEAD FEDERAL BUILDING IN PITTSBURGH, PA. PA0233ZZ Solicitation ID/Procurement Identifier: EQ3PSK-24-0037 Ultimate Completion Date: Fri Feb 28 18:00:00 GMT 2025
The removal of heat from the facility through the tower to exchange heat into the inside of the building has been inconsistent and unsatisfactory. Please refer to the Statement of Work (SOW) for more details.
The mechanical spaces servicing the building located in the center and accessible through a breezeway are small because the HVAC system is based on water-to-air heat exchange units serviced by a central plant in the neighboring Community Building to the north. Besides those on each floor, there are electrical equipment rooms as well as common mud and maid rooms.
Overhaul Chillers and Cooling Towers for DPW, USAG Humphreys