Search results for: heating hot water circulating

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 78
  • DIXIE NF-DIRECT REPLACE EXISTING HOT WATER BOILER, HEATING HOT WATER CIRCULATING PUMPS AND DOMESTIC WATER HEATE...

    Type : Contract

    Due : 30 Apr, 2022 (about 2 years ago)
    Posted : about 2 years ago
    Started : 05 Jan, 2022 (about 2 years ago)

    DIXIE NF-DIRECT REPLACE EXISTING HOT WATER BOILER, HEATING HOT WATER CIRCULATING PUMPS AND DOMESTIC WATER HEATER BOILER. PER QUOTE #JD21-098. Solicitation ID/Procurement Identifier: 1240LS22C0002 Ultimate Completion Date: Sat Apr 30 17:00:00 GMT 2022

    From: Federal Procurement Data System (Federal)

  • GHC Heritage Hall Boiler Project

    Type : Bid Notification

    Due : 08 Feb, 2022 (about 2 years ago)
    Posted : about 2 years ago
    Started : 31 Jan, 2022 (about 2 years ago)

    Additionally, the scope includes the removal of the existing boiler pumps and heating hot water circulating pump for the building, as well as associated accessories. The room supply fan will be removed and existing pumps will be replaced with new equipment to facilitate the new boiler operation. This work is scheduled to be completed in one phase of construction.

    From: Georgia (State)

  • J045--NTX B-3 HEAT EXCHANGER SYSTEM REPLACEMENT

    Type : Bid Notification

    Due : 07 Sep, 2022 (20 months ago)
    Posted : 20 months ago
    Started : 16 Aug, 2022 (20 months ago)

    This system provides for heating water to RTU s in building 3. Replacement shall include (2) tube bundles, (2) hot water circulating pumps and all associated components as required to provide a fully functional VA approved system. VA shall provide (2) Siemen s control valve assemblies for contractor to install. See Statement of Work for more details.

    From: Federal Government (Federal)

  • Continuing Service Contract for HVAC Test and Balance Services

    Type : Bid Notification

    Due : 30 Apr, 2024 (Yesterday)
    Posted : 1 day ago
    Started : 26 Mar, 2024 (1 month ago)

    Hydronic systems test and balance or re-balance will include balancing of condenser, chilled and heating hot water circulating systems to obtain water quantities, and temperature differentials through all system components. The HVAC Test and Balance Consultant will perform the tests and adjustments, listed below, in balancing the hydronic systems.

    From: Osceola County School Board (School)

  • Occum Hall Make Up Air AHU Unit Replacement

    Type : Bid Notification

    Due : 01 Dec, 2022 (17 months ago)
    Posted : 18 months ago
    Started : 02 Nov, 2022 (18 months ago)

    Modifications of the hot water piping, replacement of the circulating pump and reconnecting the hot water piping to the AHU heating coil. 4. Automatic controls and power reconnection.

    From: Connecticut (State)

  • CHEMICAL WATER TREATMENT (221324-002)

    Type : Bid Notification

    Due : 31 Dec, 2025 (in 20 months)
    Posted : 12 days ago
    Started : 04 Apr, 2024 (27 days ago)

    Chemicals are to be shipped on an as needed basis to treat I 0% of total system volume at each location. 7003 OPEN CIRCULATING WATER TREATMENT AS MENTIONED IN ARTICLE V - 5005 Furnish a sufficient supply ofa liquid polyphosphate scale and corrosion inhibitor which has approval for use in potable water systems. Product will be fed to maintain 4-12 ppm as phosphonate.

    From: Erie (County)

  • Continuing Service Contract for HVAC Test and Balance Services

    Type : Bid Notification

    Due : 19 Mar, 2024 (1 month ago)
    Posted : 2 months ago
    Started : 07 Feb, 2024 (2 months ago)

    Hydronic systems test and balance or re-balance will include balancing of condenser, chilled and heating hot water circulating systems to obtain water quantities, and temperature differentials through all system components. The HVAC Test and Balance Consultant will perform the tests and adjustments, listed below, in balancing the hydronic systems.

    From: Osceola County School Board (School)