Type : Bid Notification
Station, Hedge Lane & 16 1⁄2 Cousteau Lane plans included in this project.
Station, Hedge Lane & 16 1⁄2 Cousteau Lane plans included in this project.
The work consists of the following: Reconstruction and re-alignment of Hedge Lane and 167th Street, near the current intersection of Hedge Lane and 167th Street and south approximately 2640 feet. Both streets will be constructed as a three-lane, 40-foot back-of-curb to back-of-curb typical section.
The project limits will be Hedge Lane to Parker Street. Bid documents including drawings and specifications are on file at the office of Public Works of Olathe, Kansas, and are open for public inspections. Bid documents and drawings may be downloaded free of charge from app.negometrix.com. Only bids submitted electronically at app.negometrix.com will be accepted.
Mail Purchase Order to: SKC Communication Products, LLC 8320 Hedge Lane Terrace Shawnee Mission, KS 66227 Visit SKCs website at http://eic00p.skccom.com SKC is available as part of E&Is JAGGAER offering.
Hedge Lane, Olathe, KS, 66061, and the installation of 440 linear feet of 72” tall chain link fence with (1) 8’ wide double swing gate at Olathe Fire Station No. 8, 14700 S. Lakeshore Drive, Olathe, KS, 66061.
To be sustainable, the City is seeking to expand on an existing biosolids composting facility located off of W 127th St and N Hedge Lane. The facility takes digested biosolids from Harold Wastewater Treatment Plant, but Cedar Creek does not have digesters causing concern for odors. The expansion will need to be a new enclosed building with odor control for operations.
12-Ora-22-R11.6/R12.5 *** ORANGE COUNTY IN SANTA ANA AND ORANGE FROM 0.1 MILE WEST OF SANTIAGO CREEK TO 0.2 MILE EAST OF CAMBRIDGE STREET OVERCROSSING