Search results for: hercules aircraft

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 297
  • CABLE KIT, THROTTLE; C-130 HERCULES AIRCRAFT

    Type : Pre-Bid Notification

    Due : 01 Jul, 2020 (about 3 years ago)
    Posted : about 4 years ago
    Started : 15 May, 2020 (about 4 years ago)

    A solicitation will be issued for End Item: C-130 Hercules Aircraft, NSN 1680-01-414-6684, Cable Kit, Throttle, IQC 1000092442.  Delivery schedule is 90 days ARO.  Critical Application item.  Air Force Critical Safety Item.  Configuration Control item. NAICS is 336413.  This is a 100% Small Business Set-Aside, full and open after exclusions of sources procedures.  Intended sources:  Loos & Co., Inc. (CAGE 59157), Aero Swage Ltd.

    From: Federal Government (Federal)

  • UNIVERSAL JOINT ASSEMBLY / 06F, C-130 HERCULES AIRCRAFT

    Type : Bid Notification

    Due : 25 Apr, 2019 (about 5 years ago)
    Posted : about 5 years ago
    Started : 11 Mar, 2019 (about 5 years ago)

    NSN 1680-00-673-4316; IQC PR 1000074173; ITEM: UNIVERSAL JOINT ASSEMBLY; ROLLS-ROYCE CORPORATION (CAGE 63005) PART NUMBER 6827186; PACIFIC SKY SUPPLY INC. (CAGE 66905) PART NUMBER 6827186. THE SOLICITATION WILL BE ISSUED AS AN UNRESTICTED PROCUREMENT (OTHER THAN FULL AND OPEN COMPETITION). THIS PROCUREMENT IS FOR AN INDEFINITE QUANTITY CONTRACT (IQC) WITH A BASE YEAR AND FOUR ONE YEAR OPTION PERIODS (NOT TO EXCEED 60 MONTHS). THE ESTIMATED ANNUAL QUANTITY IS 236 EACH.CONTRACTOR FIRST ARTICLE TESTING AND CONTRACTOR PRODUCTION LOT TESTING ARE REQUIRED. DELIVERY OF THE FIRST ARTICLE TEST REPORT WILL BE 250 DAYS ARO. GOVERNMENT APPROVAL/DISAPPROVAL WILL BE 120 DAYS AFTER RECEIPT OF FIRST ARTICLE TEST REPORT. DELIVERY OF THE CONTRACTOR PRODUCTIO...

    From: Federal Government (Federal)

  • VALVE,FUEL PRESSURI for C-130 HERCULES AIRCRAFT

    Type : Pre-Bid Notification

    Due : 18 Sep, 2019 (about 4 years ago)
    Posted : about 4 years ago
    Started : 03 Sep, 2019 (about 4 years ago)

    SYNOPSISNSN: 2915-01-650-6034Nomenclature: VALVE,FUEL PRESSURIP/N: 100-0484-02PR: 80946704This is not a Critical Safety Item (CSI). It is not a commercial item. Higher Level Quality Management applies. The acquisition is unrestricted other than full & open competition. This is a sole source item coded 3P. This agency does not possess the technical data package for this National Stock Number to evaluate alternate offers. Any manufacturer, other than the approved source, Parker Hannifin, CAGE 99321, interested in submitting a proposal for this item must submit a complete source approval request (SAR), package for evaluation for future procurements. The SAR package will not be considered for the current procurement.Submit SAR packages to:Defen...

    From: Federal Government (Federal)

  • HEAD ASSEMBLY / 06F, C-130 HERCULES AIRCRAFT

    Type : Pre-Bid Notification

    Due : 29 Apr, 2020 (about 4 years ago)
    Posted : about 4 years ago
    Started : 13 Mar, 2020 (about 4 years ago)

    Product Service Code:- 2945 - ENGINE AIR AND OIL FILTERS, CLEANERS, AIRCRAFT PRIME MOVING NAICS Code:- 336412 - Aircraft Engine and Engine Parts Manufacturing Primary point of contact:- Gladys Brown   gladys.brown@dla.mil   Phone Number 8042791561 Secondary point of contact:-

    From: Federal Government (Federal)

  • AIRFOIL RIB / 06F, C-130 HERCULES AIRCRAFT

    Type : Pre-Bid Notification

    Due : 26 Feb, 2020 (about 4 years ago)
    Posted : about 4 years ago
    Started : 10 Jan, 2020 (about 4 years ago)

    NSN 1560-01-453-9390; IQC PR 1000083056; ITEM: AIRFOIL RIB; PARTS SHALL BE MANUFACTURED IN ACCORDANCE WITH BASIC DRAWING  98897 343600, REVISION G, DTD 11/18/91, PART PIECE NUMBER 343600-3L.  THE SOLICITATION WILL BE ISSUED AS 100% SMALL BUSINESS SET-ASIDE (FULL AND OPEN COMPETITION AFTER THE EXCLUSION OF SOURCES). THIS PROCUREMENT IS FOR AN INDEFINITE QUANTITY CONTRACT (IQC) FOR A BASE PERIOD OF 5 YEARS WITH ZERO (0) OPTIONS.  THE ESTIMATED ANNUAL QUANTITY IS 308 EACH.  FIRST ARTICLE TESTING IS REQUIRED. DELIVERY OF THE FIRST ARTICLE UNITS WILL BE 290 DAYS ADO.  GOVERNMENT TESTING, EVALUATION, AND NOTIFICATION WILL BE 135 DAYS.  DELIVERY OF THE PRODUCTION UNITS WILL BE 290 DAYS AFTER FIRST ARTICLE APPROVAL.  FOB IS AT DESTINATION.  FIRST A...

    From: Federal Government (Federal)

  • AIRCRAFT SEAT / 06F, C-130 HERCULES AIRCRAFT

    Type : Pre-Bid Notification

    Due : 04 Mar, 2020 (about 4 years ago)
    Posted : about 4 years ago
    Started : 17 Jan, 2020 (about 4 years ago)

    NSN 1680-01-413-6055; IQC PR 1000082969; ITEM: AIRCRAFT SEAT; PARTS SHALL BE MANUFACTURED IN ACCORDANCE WITH BASIC DRAWING  98897 3312235, REVISION E, DTD 07/13/10, PART PIECE NUMBER 3312235-12.  THIS PROCUREMENT IS FOR AN INDEFINITE QUANTITY CONTRACT (IQC) FOR A BASE PERIOD OF 5 YEARS WITH ZERO (0) OPTIONS.  THE ESTIMATED ANNUAL QUANTITY IS 48 EACH.  DELIVERY WILL BE 370 DAYS AFTER DATE OF ORDER. 

    From: Federal Government (Federal)

  • BUSHING ASSEMBLY / 06F, C-130 HERCULES AIRCRAFT

    Type : Pre-Bid Notification

    Due : 24 Apr, 2020 (about 4 years ago)
    Posted : about 4 years ago
    Started : 10 Mar, 2020 (about 4 years ago)

    NSN: 1560-00-077-2265, IQC PR: 1000088725, ITEM: BUSHING ASSEMBLYPARTS SHALL BE MANUFACTURED IN ACCORDANCE WITH BASIC DRAWING 98897 388174, REVISION G, DTD 10/19/87, PART PIECE NUMBER 388174-11. THE SOLICITATION WILL BE ISSUED AS A 100% SMALL BUSINESS SET-ASIDE (FULL AND OPEN COMPETITION AFTER THE EXCLUSION OF SOURCES).   THIS PROCUREMENT IS FOR AN INDEFINITE QUANTITY CONTRACT (IQC) FOR A BASE PERIOD OF 5 YEARS WITH ZERO (0) OPTIONS.  THE ESTIMATED ANNUAL QUANTITY IS 804 EACH. FIRST ARTICLE TESTING IS REQUIRED. DELIVERY OF THE FIRST ARTICLE UNITS WILL BE 180 DAYS ADO.  GOVERNMENT TESTING, EVALUATION, AND NOTIFICATION WILL BE 135 DAYS.  DELIVERY OF THE PRODUCTION UNITS WILL BE 180 DAYS AFTER FIRST ARTICLE APPROVAL.  FOB IS AT DESTINATION. FI...

    From: Federal Government (Federal)